Building Permit Fees
| ||||
---|---|---|---|---|
Category
|
Rate
| |||
A.
|
All new residential structures to include homes
and additions to living areas
|
$0.50
| ||
B.
|
All unfinished accessory residential structures
including decks, porches, garages, barns, and sheds
|
$0.25
| ||
C.
|
Swimming pools (must be fenced)
| |||
(1)
|
Aboveground
|
$50 (flat)
| ||
(2)
|
In ground
|
$200 (flat)
| ||
D.
|
Commercial/retail, per story
|
$0.30
| ||
E.
|
Institutional
|
$0.50
| ||
F.
|
Industrial
|
$0.50
| ||
G.
|
Signs - flat rate
|
$25 for home occupancy or replacement; $50 for
exterior
| ||
H.
|
Demolition of buildings - flat rate
|
$100
| ||
I.
|
Special use permit
|
$25 for minor occupation; $50 for all others
| ||
J.
|
Minimum permit fee, flat rate
|
$25
| ||
K.
|
Renovation
|
$9 per $1,000 of construction costs
| ||
L.
|
Decks, porches
|
$0.28 per square foot
| ||
M.
|
Telecommunication structures
|
$6 per $1,000 of construction costs.
| ||
(When work has begun prior to issuance of a
permit, the above fees shall be doubled.)
|
Review and Hearing Fees
| |||||
---|---|---|---|---|---|
Category
|
Rate
| ||||
A.
|
Zoning Board of Appeals
|
$200 plus cost of notices and advertising
| |||
B.
|
Change of use permit
|
$100
| |||
C.
|
Subdivision fees
| ||||
(1)
|
Planning services
|
$1,500
| |||
(2)
|
Sketch plan
| ||||
Minor
|
$250 per lot
| ||||
Major
|
$500 per lot
| ||||
(3)
|
Preliminary plan
|
$500
| |||
Plus per unit/lot fee
|
$200
| ||||
(4)
|
Final plan
|
$250 per lot
| |||
D.
|
Site plan
| ||||
(1)
|
Minor
|
$500
| |||
(2)
|
Major
|
$1,000
|