[Added by Ord. 1999-1, 1/20/1999, § 6; as amended by Ord. 2009-2, 6/1/2009, § 5]
Upon completion of all required improvements and prior to final inspection of improvements, the developer shall submit a plan labeled "as-built plan," showing the location, dimensions and elevation of all improvements. Said plan must be signed and sealed by a duly licensed land surveyor which certifies that the as-built plan correctly shows all topographic features. Said plan must be signed and sealed by a duly licensed professional engineer, land surveyor or landscape architect certifying that the resultant grading, drainage structures and/or drainage systems, stormwater management systems and erosion and sediment control practices, including vegetative measures, are in substantial conformance with the previously approved drainage and specifications and will function as intended. The plan shall note all deviations from the previously approved drainage and specifications. Three copies of the plan (one paper, one reproducible sepia, and one electronic copy in standard pdf format on CD-ROM) shall be submitted to the Township. For "phased" land developments, as-built plans will be required before construction of subsequent phases can begin.