[Ord. 161, 4/11/2006, § 1]
As used in this Part, the following terms shall have the meanings indicated unless a different meaning clearly appears from the context:
Filling the annular space between the well casing and bore hole with concrete, neat cement, or other approved impervious material to form a permanent watertight joint or connections.
Water wells, test holes for water wells, uncompleted wells and monitoring wells.