A.
The minimum control requirements established in this section and the Design Manual are as follows:
(1)
All counties and their incorporated municipalities shall require that the planning techniques, nonstructural practices, and design methods specified in the Design Manual be used to implement ESD to the MEP. The use of ESD planning techniques and treatment practices must be exhausted before any structural BMP is implemented. Stormwater management plans for development projects subject to this chapter shall be designed using ESD sizing criteria, recharge volume, water quality volume, and channel protection storage volume criteria according to the Design Manual. The MEP standard is met when channel stability is maintained, predevelopment groundwater recharge is replicated, nonpoint source pollution is minimized, and structural stormwater management practices are used only if determined to be absolutely necessary.
(2)
In addition to the requirements of § 193-10A(1), the Town of Federalsburg requires control of the overbank flood protection volume for the two-year frequency storm event.
(3)
The Town of Federalsburg may require more than the minimum control requirements specified in this chapter if hydrologic or topographic conditions warrant or if flooding, stream channel erosion, or water quality problems exist downstream from a proposed project.
B.
Alternate minimum control requirements may be adopted subject to Administration approval. The Administration shall require a demonstration that alternative requirements will implement ESD to the MEP and control flood damages, accelerated stream erosion, water quality, and sedimentation. Comprehensive watershed studies may also be required.
C.
Stormwater management and development plans where applicable, shall be consistent with adopted and approved watershed management plans or flood management plans as approved by the Maryland Department of the Environment in accordance with the Flood Hazard Management Act of 1976.