[Amended 1-23-2019]
Violation | Penalty | |
|---|---|---|
Install or construct septic system, without a permit or BOH approval | $200 | |
Pump or haul offal without a permit | $200 | |
Failure to submit pumping records within 30 days of pumping system | $50; each day a separate offense | |
Sewage overflow | $50; each day a separate offense | |
Drill a well without a permit | $200 | |
Not submitting well results within 30 days | $50 | |
Use a septic system without a certificate of compliance | $50; each day a separate offense | |
Backfill a septic system without an inspection | $200 | |
Occupy with a change of use without BOH approval | $50; each day a separate offense | |
Dump or discharge sewage or septage in unauthorized location | $200 | |
Not submitting Title 5 reports within 30 days of inspection | $50; each day a separate offense | |
Not submitting soil evaluator records in 60 days | $50 | |
Hauling rubbish without a license | $200; each day a separate offense | |
Disposing of rubbish in an unauthorized location | $200 | |
Selling a house without a Title 5 inspection | $200 | |
State Sanitary and Environmental Codes[1] | ||
310 CMR 15 | $50; each day a separate offense | |
105 CMR 590 | $50; each day a separate offense | |
2013 Federal Food Code | $50; each day a separate offense | |
105 CMR 410 | $50; each day a separate offense | |
105 CMR 123 | $50; each day a separate offense | |
105 CMR 430 | $50; each day a separate offense | |
105 CMR 435 | $50; each day a separate offense | |
310 CMR 7 | $50; each day a separate offense | |
310 CMR 16 | $50; each day a separate offense | |
310 CMR 19 | $50; each day a separate offense | |
MGL c. 111, § 122 | $50; each day a separate offense | |
Smoke-free workplace MGL c. 270, § 22 | $50; each day a separate offense | |
Town of Plainville Board of Health Regulations (Division 5 of the Code of the Town of Plainville) | $50; each day a separate offense | |