A.
Where there are no house connections already made to the curbline from the sewer there is hereby imposed on the property owner the following charges for such connections from the line of the sewer to the inside of the curbline or proposed curbline:
4-inch or 5-inch connection | $100 | |
6-inch connection | $150 | |
8-inch connection | $200 |
B.
Such charge shall be paid to the Borough Manager at the time application is made for the connection to the sewer system.