During construction, the applicant shall:
A. Take all necessary measures to control dust migration, including
but not limited to watering, mulching and seeding. No chemical applications
for dust control are allowed. Water used to control dust shall be
nonpotable.
B. Keep all approach roads to the development site used by constructors
or material suppliers clean and free of mud.
C. Adhere to and obey all applicable bylaws regulating noise levels,
workdays and work hours.
In the event that any subdivider shall intend to make land changes
by grading, filling, excavating or the removal or destruction of the
natural topsoil or vegetative covering thereon in accordance with
a subdivision plan submitted to the Town, the same shall only be approved
and accomplished after the developer has submitted to the Town an
erosion and sedimentation control plan. Erosion control measures shall
be employed as necessary to prevent loss of soil from erosion and
also to prevent resulting property damage, siltation and contamination
of watercourses or impoundments. Erosion control measures may include
hay bales, silt fences or other provisions or combinations thereof.