A.
Inspect all building laterals before backfilling trench, including inside plumbing for connections of french drains, sump pumps, and basement floor drains.
B.
Inspect outside drains for proper connection of area drains, french drains, driveway drains, and roof leaders into storm sewers and downspouts.
C.
Reinspect all new construction, using any and all appropriate means, including but not limited to low-pressure air testing, smoke testing, dye testing, dye flooding, and internal TV video inspection of both inside plumbing (house side of trap) and the building lateral to the Borough of Irwin's main line.
D.
Reinspection to be done either prior to issuance of a building occupancy permit by the Borough of Irwin or at the time of a no-lien letter request (issued before a property closing).