An annual license fee may be established by the Board of Supervisors
for each manufactured home. The license fee shall be for the calendar
year of January 1 through December 31 and will not be prorated for
any part of the licensing year. The fee shall be payable by the manufactured
home owner within a ten-day period after such manufactured home is
placed in a manufactured home park during the licensing year.
Annual license fees may be established by the Board of Supervisors
for each manufactured home park and/or for each manufactured home
lot within the park. The license fee shall be for the calendar year
of January 1 through December 31 and will not be prorated for any
part of the licensing year. The fees shall be payable when the certificate
of occupancy is issued.
A placement fee for manufactured homes may be established by
the Board of Supervisors. This fee shall be charged for manufactured
homes to be located within the County and for each relocation. The
fee shall be paid when the manufactured home is inspected.
The owner of any manufactured home moving the manufactured home
into the County for use rather than for sale shall, within 10 days
after moving said manufactured home, notify the Commissioner of Revenue
of Carroll County of his name, address, and description and location
of said manufactured home. No manufactured home which has been in
use as a place of residence or office shall be moved from the County
until the owner has paid the County all property taxes assessed or
assessable against said manufactured home.
There shall be a charge of $15 per manufactured home lot for
the examination and approval or disapproval of every small manufactured
home park plat containing four new lots or less, for both preliminary
and final, reviewed by the agent. There shall be a charge in the amount
of $150 for the examination and approval or disapproval of every other
manufactured home park plat, both for preliminary and final, plus
a charge of $25 per lot described thereon. At the time of filing the
preliminary plat, the manufactured home park developer shall deposit
the required fee with the agent. The plat shall not be processed for
approval or disapproval until the required fees have been paid.