The following standards apply to new development, including new and substantially improved structures, in the areas of special flood hazard shown on the Flood Insurance Rate Map designated in § 108-6.
A.
Subdivision proposals. The following standards apply to all new subdivision proposals and other proposed development in areas of special flood hazard (including proposals for manufactured home and recreational vehicle parks and subdivisions):
(1)
Proposals shall be consistent with the need to minimize flood damage;
(2)
Public utilities and facilities such as sewer, gas, electrical and water systems shall be located and constructed so as to minimize flood damage; and
(3)
Adequate drainage shall be provided to reduce exposure to flood damage.
B.
Encroachments.
(1)
Within Zones A1-A30 and AE, on streams without a regulatory floodway, no new construction, substantial improvements or other development (including fill) shall be permitted unless:
(a)
The applicant demonstrates that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any location; or
(b)
The Town of East Fishkill agrees to apply to the Federal Emergency Management Agency (FEMA) for a conditional FIRM revision, FEMA approval is received and the applicant provides all necessary data, analyses and mapping and reimburses the Town of East Fishkill for all fees and other costs in relation to the application. The applicant must also provide all data, analyses and mapping and reimburse the Town of East Fishkill for all costs related to the final map revision.
(2)
On streams with a regulatory floodway, as shown on the Flood Boundary and Floodway Map or the Flood Insurance Rate Map adopted in § 108-6, no new construction, substantial improvements or other development in the floodway (including fill) shall be permitted unless:
(a)
A technical evaluation by a licensed professional engineer shows that such an encroachment shall not result in any increase in flood levels during occurrence of the base flood; or
(b)
The Town of East Fishkill agrees to apply to the Federal Emergency Management Agency (FEMA) for a conditional FIRM and floodway revision, FEMA approval is received and the applicant provides all necessary data, analyses and mapping and reimburses the Town of East Fishkill for all fees and other costs in relation to the application. The applicant must also provide all data, analyses and mapping and reimburse the Town of East Fishkill for all costs related to the final map revisions.
C.
No construction or development shall be permitted within the regulated floodway.
[Added 2-10-2022 by L.L. No. 1-2022]
D.
No construction or development shall be permitted within the regulated floodplain unless approved by the local administrator.
[Added 2-10-2022 by L.L. No. 1-2022]
E.
Unless waived by the local administrator, a "no adverse effect" analysis shall be performed and certified by a trained and qualified licensed professional engineer, as approved by the Town, experienced in performing hydraulic HEC-RAS analyses. The stream analysis shall be performed utilizing current ground-based survey; no aerial topographic data shall be accepted.
[Added 2-10-2022 by L.L. No. 1-2022]
F.
The final report of the analysis shall include plans, sections and cross-sections of the affected properties, streams, creeks and/or rivers.
[Added 2-10-2022 by L.L. No. 1-2022]
G.
In any area where there is an increase in the base flood elevation (BFE), the lowest adjacent grades (LAG) at all potentially affected structures in the area shall be surveyed, and if a structure's LAG was below the BFE resulting from the proposed development, then it could be assumed that water would enter and damage that structure and/or its contents. Any such identified adverse effects would then be mitigated as a condition of the floodplain development permit.
[Added 2-10-2022 by L.L. No. 1-2022]
H.
New mounded septic fields shall not be permitted within a floodplain.
[Added 2-10-2022 by L.L. No. 1-2022]
I.
All new development on undeveloped or redeveloped properties determined to occur in a flood zone shall meet all design standards required in this chapter and be submitted to the Zoning Board of Appeals for approval.