A revision to a previously submitted SWM site plan that involves
a change in SWM BMPs, stormwater management facilities, or changes
in analytical techniques, or that involves the relocation or redesign
of SWM BMPs, or that is necessary because soil or other conditions
are not as stated on the SWM site plan, as determined by the Borough,
shall require a resubmission of the revised SWM site plan in accordance
with this article, including applicable fees. For NPDES-permitted
sites, any revised SWM site plan shall also be resubmitted to the
York County Conservation District for review. In the case of an SWM
site plan which contains minor deficiencies, such as a missing label,
omission of a required note or minor construction detail, as determined
by the Borough, the Borough may accept a resubmission of such SWM
site plan without the requirement of a review fee, or for a lesser
fee, as provided for in the Borough fee schedule.
A disapproved SWM site plan may be resubmitted, with the revisions addressing the Borough's concerns as stated regarding the original submission, to the Borough in accordance with this article. The applicable review fee must accompany the submission of a revised SWM site plan, unless such fee is waived by the Borough. (See §
144-404.)