[Amended 9-22-1987 by Ord. No. 14-87; 9-29-2015 by Ord. No. 2015-13]
Zoning permits shall hereafter be secured from the Zoning Officer prior to construction, erection or alteration of any structure or part of a structure or use of a structure or land. All requests for zoning permits shall be made in writing by the owner or his authorized agent, shall include a statement of the use or intended use of the building, structure or land and shall be accompanied by a site plan showing thereon the exact size, shape and location of all proposed structures and all existing structures and such other information as may be necessary to provide for the enforcement of this chapter and as may be required by the Zoning Officer. The applicant shall also submit a detailed plot plan verified by the applicant and/or his engineer, showing the location of any existing and proposed sewer lines, including the lateral pipe running from the residence to the grinder pump and the lateral pipe running from the grinder pump to the curb stop valve into the sewer main running along the street. The applicant shall also submit proof that all sewer fees are current and that all taxes or assessments for local improvements are current on the property which is the subject of the application.