[Ord. 430, 7/16/2008; as amended by Ord. 438, 8/19/2009]
A. A schedule of fees for building permits, occupancy permits, sign
permits, landscape plan material maintenance, transportation impact
fees, and applications for petitions to amend this chapter, or to
initiate action on conditional uses before the Planning Commission
or on special exception, or variances or challenges to a decision
of the Zoning Officer before the Zoning Hearing Board shall be established
by resolution of the Board of Supervisors, posted conspicuously in
the Township Building, and subsequently amended only by action of
the Board of Supervisors.
B. No permit, certificate, application or variance shall be issued unless
or until such costs, charges, fees or expenses listed below have been
paid in full, nor shall any action be taken on proceedings before
the Zoning Hearing Board unless or until preliminary charges and fees
have been paid in full.
C. A building permit shall be required for all new construction, additions
or alterations or any structural or interior changes required for
a change of the structure's use.
D. No building permit shall be required for the following:
(1)
Interior or exterior painting.
(3)
Replacement of existing doors, windows, storm doors or screens
without structural changes.
(4)
Replacement of existing roofing.
(5)
Repair or replacement of existing soffits or gutters.
(6)
Repair or repointing of existing masonry.