[Ord. No. 1323, 12-5-2001; Ord. No. 1406, 3-2-2005]
The size, slope, alignment, materials of construction of a building sewer; the methods to be used in excavating, placing of the pipe, joining, testing and backfilling the trench; and the connection of the building sewer into the public sewer shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the City of Holland. In the absence of code provisions or in application thereof, the materials and procedures set forth in appropriate specifications of the ASTM, and WEF MOP No. 9 and any amendments thereto shall apply.