[R.O. 2011 § 710.110; Ord. No. 17-184 § 1, 9-20-2017]
A. Users shall provide wastewater treatment as necessary to comply with this Chapter and shall achieve compliance with all categorical Pretreatment Standards, Local Limits and the prohibitions set out in Section
710.050 of this Chapter within the time limitations specified by EPA, the State, or the Director of Public Works, whichever is more stringent.
B. Any facilities necessary for compliance
shall be provided, operated, and maintained at the User's expense.
Detailed plans describing such facilities and operating procedures
shall be submitted to the Director of Public Works for review, and
shall be acceptable to the Director of Public Works before such facilities
are constructed. The review of such plans and operating procedures
shall in no way relieve the User from the responsibility of modifying
such facilities as necessary to produce a discharge acceptable to
the City under the provisions of this Chapter.
[R.O. 2011 § 710.120; Ord. No. 17-184 § 1, 9-20-2017]
A. Whenever deemed necessary, the Director
of Public Works may require Users to restrict their discharge during
peak flow periods, designate that certain wastewater be discharged
only into specific sewers, relocate and/or consolidate points of discharge,
separate sewage wastestreams from industrial wastestreams, and require
such other conditions as may be necessary to protect the POTW and
determine the User's compliance with the requirements of this Chapter.
B. The Director of Public Works may require
any person discharging into the POTW to install and maintain, on their
property and at their expense, a suitable storage and flow-control
facility to ensure equalization of flow. A wastewater discharge permit
may be issued solely for flow equalization.
C. Grease, oil, and sand interceptors shall be provided when, in the opinion of the Director of Public Works, they are necessary for the proper handling of wastewater containing excessive amounts of grease and oil, or sand; except that such interceptors shall not be required for residential users. All interception units shall be of type and capacity approved by the Director of Public Works and shall comply with the City's Oil and Grease Management Program, Article
XIV of this Chapter, and shall be so located to be easily accessible for cleaning and inspection. Such interceptors shall be inspected, cleaned, and repaired, in accordance with the City's Oil and Grease Management Program, by the User at the User's expense.
D. Users with the potential to discharge flammable
substances may be required to install and maintain an approved combustible
gas detection meter.
[R.O. 2011 § 710.130; Ord. No. 17-184 § 1, 9-20-2017]
A. At least once every two (2) years, the
Director of Public Works shall evaluate whether each Significant Industrial
User needs an accidental discharge/slug control plan or other action
to control Slug Discharges. The Director of Public Works may require
any User to develop, submit for approval, and implement such a plan
or take such other action that may be necessary to control Slug Discharges.
Alternatively, the Director of Public Works may develop such a plan
for any User. An accidental discharge/slug control plan shall address,
at a minimum, the following:
1.
Description of discharge practices,
including non-routine batch discharges;
2.
Description of stored chemicals;
3.
Procedures for immediately notifying the Director of Public Works of any accidental or Slug Discharge, as required by Section
710.350 of this Chapter; and
4.
Procedures to prevent adverse impact
from any accidental or Slug Discharge. Such procedures, include, but
are not limited to, inspection and maintenance of storage areas, handling
and transfer of materials, loading and unloading operations, control
of plant site runoff, worker training, building of containment structures
or equipment, measures for containing toxic organic pollutants, including
solvents, and/or measures and equipment for emergency response.
[R.O. 2011 § 710.140; Ord. No. 17-184 § 1, 9-20-2017]
A. Septic tank waste may be introduced into the POTW only at locations designed by the Director of Public Works, and at such times as are established by the Director of Public Works. Such waste shall not violate Sections
710.050 through
710.100 of this Chapter or any other requirements established by the City. The Director of Public Works may require septic tank waste haulers to obtain wastewater discharge permits.
B. The Director of Public Works shall require
haulers of industrial waste to obtain wastewater discharge permits.
The Director of Public Works may require generators of hauled industrial
waste to obtain wastewater discharge permits. The Director of Public
Works also may prohibit the disposal of hauled industrial waste. The
discharge of hauled industrial waste is subject to all other requirements
of the Chapter.
C. Industrial waste haulers may discharge
loads only at locations designated by the Director of Public Works.
No load may be discharged without prior consent of the Director of
Public Works. The Director of Public Works may collect samples of
each hauled load to ensure compliance with applicable Standards. The
Director of Public Works may require the industrial waste hauler to
provide a waste analysis of any load prior to discharge.
D. Industrial waste haulers must provide a
waste-tracking form for every load. This form shall include, at a
minimum, the name and address of the industrial waste hauler, permit
number, truck identification, names and addresses of sources of waste,
and volume and characteristics of waste. The form shall identify the
type of industry, known or suspected waste constituents, and whether
any wastes are RCRA hazardous wastes.