[Ord. No. 01-061 §§1—8, 5-30-2001]
A.
An initial license (as opposed to the annual renewal license) for the construction and operation or expansion of a sanitary landfill, demolition landfill, waste processing facility, or transfer station may be issued by the Division Director following the procedures declared in this Chapter. An applicant for a license shall file three (3) copies of an application addressed to and filed with the Division Director. The application shall consist of:
B.
All applications shall be reviewed concurrently with applications for construction and operating permits filed with the Missouri Department of Natural Resources pursuant to Section 260.205, Revised Statutes of Missouri, as amended and applicable regulations.
D.
The application filed pursuant to Subsection (A) shall be accompanied by an application fee of five thousand dollars ($5,000.00).
E.
The Division Director shall not process an application which is not accompanied by the application fee required by this Section.