[Ord. No. 01-061 §§1—8, 5-30-2001]
A. 
Despite the approval of a waste facility plan for a sanitary landfill, demolition landfill, waste processing facility or transfer station for a fixed number of years, and the issuance of a license for the construction and operation of facility, the operator of each facility shall apply to renew such license annually for each year beginning with each anniversary date of the issuance of such initial license, whether the construction of the facility is completed or not. The renewal application as set forth in the schedule in Subsection (2) of this Section shall be addressed and delivered to the Division Director at least thirty (30) days prior to each anniversary date of the initial license and shall contain:
1. 
A request that a renewal license be issued for a period of one (1) year, and
2. 
A report containing the information required in Section 240.820.
[Ord. No. 01-061 §§1—8, 5-30-2001; Ord. No. 03-180 §1, 11-26-2003]
A. 
Every application for a renewal license for a sanitary or demolition landfill, waste processing facility or transfer station shall contain the following information:
1. 
Any changes in the waste facility plan which must be made to reflect actual usage or conditions.
2. 
Total incoming waste tonnage received at the facility and volumes of recovered/processed commodities if applicable during the previous year.
3. 
Summary of all environmental monitoring data for all media compiled during previous period with interpretation of trends using suitable modeling presentation.
4. 
The quantities of leachate and/or landfill gases collected, processed, treated and disposed or dissipated.
5. 
Equipment replaced or changed or anticipated to be replaced or changed.
6. 
A report describing the infrastructures which have been put in place including as-built construction plans and records.
7. 
If the facility is still under construction, a written report detailing conformance with the schedule contained in the waste facility plan.
[Ord. No. 01-061 §§1—8, 5-30-2001]
Upon receipt of the renewal application described in Sections 240.810 and 240.820, and the payment of the basic annual licensing fee as set forth in Section 240.840(A), the Division Director shall issue a renewal license for the waste facility, but only if the surcharge on waste deposited at the facility for prior year(s), if applicable, has been paid to St. Charles County. The Division Director shall not issue the renewal license if the license to operate the facility has been revoked pursuant to this Chapter.
[Ord. No. 01-061 §§1—8, 5-30-2001; Ord. No. 02-114 §§2—3, 7-31-2002; Ord. No. 03-024 §2, 2-26-2003; Ord. No. 03-180 §2, 11-26-2003]
A. 
The basic annual licensing fee shall be assessed as follows:
1. 
Sanitary landfill: $6,000.00.
2. 
Demolition landfill: $3,000.00.
3. 
Waste processing facility: $3,000.00.
4. 
Transfer station: $2,000.00.