[Ord. No. 01-061 §§1—8, 5-30-2001]
A. No
person shall construct a solid waste disposal area waste processing
facility or transfer station in a manner that does not comply with
the waste facility plan approved by the Division Director or the County
Council for such facility or with the requirements of this Chapter.
B. Site
development plans shall address consideration for minimizing incremental
disturbance of land mass by providing a logical and detailed sequence
of cell excavation, soil stockpiling, closure and cut/fill activities.
C. Construction
plans shall provide sufficient detail and quality assurance/quality
control protocol including utilization of third (3rd) party independent
consulting engineer oversight to assure integrity of major landfill
infrastructure components including, but not limited to, the following:
1. Recompacted earthen material liners/capping systems.
3. Composite lining/capped systems.
4. Leachate underdrain, collection end treatment systems.
5. LFG active extraction, recovery and treatment systems.
6. Stormwater retention and dissipation structures.
D. As-built
plans and quality assurance/quality control records documenting incremental
completion of construction/installation of the major infrastructure
components detailed in the preceding condition shall be prepared by
the registered professional engineer or certified environmental professional
of record for the project and submitted to the Division of Environmental
Services for approval following acceptance and sign-off by the applicant/facility
operator.
[Ord. No. 01-061 §§1—8, 5-30-2001]
During any period of construction (initial, expansion or modification)
of a solid waste disposal area, waste processing facility or transfer
station, the Division Director or authorized staff shall be permitted
access to the facility at reasonable times for the purpose of determining
whether the construction of the facility conforms to the waste facility
plan. The applicant shall be notified of any deficiencies or discrepancies
identified during such inspections and provided ten (10) days to respond.
The Division Director shall order construction to cease and desist
until such discrepancies are satisfactorily resolved upon staff reinspection.
[Ord. No. 01-061 §§1—8, 5-30-2001]
Notwithstanding the final approval of a waste facility plan
and issuance of a license to construct and operate a solid waste disposal
area, waste processing facility or transfer station, the facility
shall not begin to operate and accept waste until there is final approval
in writing by the Division Director indicating that a final inspection
of the facility following construction has been completed and that
the facts then in possession of the Division Director indicate that
the facility has been constructed according to the waste facility
plan. Final approval in writing by the Division Director is also required
for final construction of a facility modification prior to continued
operation in an area affected by the construction.