[Ord. No. 01-061 §§1—8, 5-30-2001]
A.
No person shall construct a solid waste disposal area waste processing facility or transfer station in a manner that does not comply with the waste facility plan approved by the Division Director or the County Council for such facility or with the requirements of this Chapter.
B.
Site development plans shall address consideration for minimizing incremental disturbance of land mass by providing a logical and detailed sequence of cell excavation, soil stockpiling, closure and cut/fill activities.
C.
Construction plans shall provide sufficient detail and quality assurance/quality control protocol including utilization of third (3rd) party independent consulting engineer oversight to assure integrity of major landfill infrastructure components including, but not limited to, the following:
D.
As-built plans and quality assurance/quality control records documenting incremental completion of construction/installation of the major infrastructure components detailed in the preceding condition shall be prepared by the registered professional engineer or certified environmental professional of record for the project and submitted to the Division of Environmental Services for approval following acceptance and sign-off by the applicant/facility operator.