[CC 1985 §5-1; Comp. Ords. §7.01(1); Ord. No. 4137, 1-11-2018; Ord. No. 4218, 6-13-2019]
A. Application.
Any person undertaking the demolition or destruction of any building
within the City limits shall first obtain a permit. Demolition permits
may be obtained by application to the Building Department on a form
provided by the Community Development Administrator.
B. Duration.
Any demolition permit under which no demolition has commenced within
thirty (30) days after the date of issuance of the permit, or under
which the proposed demolition has not been completed within six (6)
months of the date of issuance, shall expire by limitation. No work
shall take place under such permit after such expiration. An extension
of sixth (6) months for completion of the work under such permit may
be granted by the Community Development Administrator upon written
request from the applicant or contractor.
[CC 1985 §5-2; Comp. Ords. §7.01(2); Ord. No. 4137, 1-11-2018]
The Community Development Administrator shall have thirty (30)
days from the date the application is filed with the Building Department
to grant or deny the application for a permit. The permit shall be
granted if the Administrator is satisfied the demolition can be performed
safely and in accordance with all applicable ordinances. If no action
is taken by the Administrator within thirty (30) days, the permit
shall be deemed granted.
[CC 1985 §5-3; Ord. No. 2583 §§1 — 3, 12-20-1990]
A. Where Permitted. Above ground fuel storage tanks may be
placed in any industrially zoned district of the City or in any district
zoned "C-1", subject to the issuance of a special use permit by the
Board of Aldermen.
B. Maximum Tank Capacity. Above ground fuel storage tanks of
more than twelve thousand (12,000) gallons capacity shall not be permitted
within the City.
C. Standards For Installation, Venting And Spill Containment. The City hereby adopts the standards for installation, venting and
spill containment of above ground fuel storage tanks as outlined in
the Missouri Department of Agriculture's publication "Service Station
and Bulk Plant Requirements" from which this Section derives and which
is on file in the City offices. In considering an application for
a special use permit for an above ground fuel storage tank, the Board
of Aldermen may consider and apply other State and Federal standards
as it deems necessary.
[CC 1985 §5-4; Ord. No. 2586 §§1 — 3, 12-20-1990]
A. Definition. As used in this Section, the term "major
structural renovation" means any reconstruction, rehabilitation,
addition or other improvement of an existing structure, the cost of
which equals or exceeds fifty percent (50%) of the market value of
the structure before the start of construction of the major structural
renovation.
B. Compliance With Construction Standards Required. Any new
construction or major structural renovation begun after January 1,
1991, all buildings for which leases are executed by political subdivisions
of the State after January 1, 1994, and all buildings for which leases
are executed by the State of any institution of higher education after
January 1, 1994, shall comply with the standards for seismic design
and construction of the Building Officials and Code Administrators
Code or of the Uniform Building Code.
C. Buildings And Construction To Which These Provisions Are Not Applicable. This Section shall not apply to any building owned by the State,
any institution of higher education, any political subdivision upon
which construction was begun or finished before the effective date
of this Section, any private structure with less than ten thousand
(10,000) square feet in total area or any single-family or duplex
residence.
[CC 1985 §5-5; Ord. No. 2690 §§1 — 4, 4-22-1993]
A. Position Created. The position of Building Inspector is
hereby created.
B. Appointment — Qualifications. The Building Inspector
shall be appointed by the City Administrator with the advice and consent
of the Mayor and Board of Aldermen and shall serve for an indefinite
term. He/she shall be selected solely on the basis of his/her knowledge,
skills and abilities relating to building construction, carpentry,
code enforcement or related experience.
C. Compensation. The Building Inspector shall receive such
compensation as may be determined from time to time by the Board of
Aldermen.
D. General Duties. It shall be the duty of the Building Inspector
to:
1. Perform field inspections on all new construction, as well as buildings
being remodeled, to determine structural code compliance.
2. Analyze the characteristics of a structure and determine if there
are violations to the City's occupancy or maintenance codes.
3. Initiate plan reviews of construction drawings to ensure code compliance
and meet with building permit applicants if deficiencies are discovered.
4. Answer building code and occupancy code questions from other City
departments, developers and the general public.
5. Complete reports relating to violations of City building codes and
all necessary paperwork according to City policy.
6. Follow up on properties in need of reinspection.
7. Meet with contractors and builders to rectify problems that may arise.
8. Maintain accurate records and files relating to the City's building
inspection program.
9. Stay informed of new developments and requirements relating to construction
science and code enforcement.
10. Make recommendations to the City Administrator for improvement and
continuing development of the City's building inspection program.
11. File an annual report with the City Administrator summarizing the
work of the Building Inspector by number and type of inspections performed,
enforcement actions undertaken, expenses incurred and recommendations
for meeting future demands.
12. Perform other duties as assigned.
[CC 1985 §5-6; Ord. No. 2701 §§1 — 2, 6-9-1993]
A. The
use of lead pipe or lead-based solder is hereby prohibited in the
construction or modification of any public or private drinking water
system within the City.
B. If,
in the judgment of the Water Superintendent or his/her authorized
representative, lead-based materials have been used in new construction
or modifications after the effective date of this Section, due notice
shall be given to the consumer. The consumer shall immediately comply
by having the lead-based materials removed from the plumbing system
and replaced with lead-free materials. If the lead-based materials
are not removed from the plumbing system, the City shall have the
right to discontinue water service to the premises.
[CC 1985 §5-7; Ord. No. 2705 §§1 — 3, 8-24-1993]
A. Owners
and occupants of structures that have had floodwater over any electrical
outlets during the calendar year 1993 and thereafter shall not have
the structure re-energized with electricity except in compliance with
this Section.
B. Citizens Electric shall not energize electrical service in any structure subject to Subsection
(A) above unless Citizens Electric has first obtained from the owner of the structure a statement that the structure has been inspected and certified by a licensed electrician as safe to be re-energized.
C. The
owner may use any licensed electrician deemed acceptable to Citizens
Electric. Forms shall be available at Citizens Electric and City Hall.
The form is on file in the City offices.