[CC 1985 §22-171; Ord. No. 1660 §3, 2-2-1956; Ord. No. 1660E §1(2.5), 5-20-1980; Ord. No. 1660(F) §1, 10-22-1986; Ord. No. 2973 §1, 6-11-1998; Ord. No. 4594, 5-8-2025]
A.
The charges for connecting to the waterworks system shall be as follows:
1.
For each five-eighths (5/8) inch or three-quarter (3/4) inch connection, the applicant shall pay for the actual costs of the service and materials to be furnished as determined by the City. The determination of the costs for service and materials shall be provided on an annual basis by the water-sewer Superintendent and given to the City Clerk no later than October first (1st) of each year. The charge shall be payment in full for the furnishing, by the City, of a corporation cock, tools and labor to tap the main and install said corporation cock. It shall also include the furnishing and installation of one (1) five-eighths (5/8) inch or three-quarter (3/4) inch meter. This charge shall be paid in full before the City will make a service connection.
2.
For all service connections in excess of three-quarter (3/4) inch size, the applicant shall pay for the actual cost of the service and materials to be furnished as determined by the City. The determination of the costs for services and materials shall be provided on an annual basis by the water-sewer Superintendent and given to the City Clerk no later than October first (1st) of each year.
3.
All excavations, pipes, fittings, labor and other materials required for the installation of said service, other than those herein specified to be furnished by the City, shall be furnished and paid for by the applicant.
4.
For all new service connections, a System Development Fee to ensure system capacity will be charged. The fee for a five-eights (5/8) inch or three-quarter (3/4) inch connection is eight hundred dollars ($800.00) in the City and eight hundred sixty-seven dollars ($867.00) outside the City limits with charges separately for both water and sewer system capacity. Connections in excess of three-quarter (3/4) inches will be charged per the fee schedule available in the City Clerk's office.
B.
The Board of Aldermen reserves the right to make special charges for the water supplied to properties not covered by the above rates or which, in the judgment of said Board, should be charged a special rate.