[Zoning Order §14.120, 4-2-2008; Resolution 1-14-2010A Exh. A, 1-14-2010; Ord. No. 10-0145 §§1 — 2, 2-18-2010]
A.
Buffer/screen between developments of differing land uses adjoining one another or separated from one another by only a street or alley shall comply with Table 14-1 Buffer/Screen Impact. The intensity of the required buffer/screen is established according to the intensity of the abutting uses, i.e., retail development adjacent to or across the street from a residential use or development requires a more intense buffer/screen than would retail adjacent to or across from office use, etc.
B.
If a single-family subdivision is proposed adjacent to a previously approved or built, but separate single-family subdivision and the average minimum lot size of the new lots is two and one-half (2.5) times or more smaller than the average minimum lot size of the existing subdivision, the proposed subdivision shall contain a low-impact buffer/screen along the periphery adjacent to the previously approved or built subdivision. (See Section 400.4750, Table 14-1.)
C.
Residential structures permitted in the "RA-5", "LR-2", "R-40", "R-20", "R-10", and "R-7" zone districts on a single parcel are exempt from the screening and buffering requirements of Table 14-1.
[Ord. No. 16-0100 §2, 1-4-2016]
Table 14-1. Buffer/Screen Impact (Adjacent Zone District in columns and Subject Property Zone District in rows) | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
RA-5 | LR-2 | R-40 | R-20 | R-10 | R-7 | PR-1 | PR-2 | NC-1 | CC-2 | PC | PB | PI | PM | |
RA-5 | * | * | * | * | * | * | L | M | M | H | H | H | H | ** |
LR-2 | * | * | * | * | * | * | L | M | M | H | H | H | H | ** |
R-40 | * | * | * | * | * | * | L | M | M | H | H | H | H | ** |
R-20 | * | * | * | * | * | * | L | M | M | M | H | H | H | ** |
R-10 | * | * | * | * | * | * | L | M | M | M | H | H | H | ** |
R-7 | * | * | * | * | * | * | L | M | M | M | H | H | H | ** |
PR-1 | L | L | L | L | L | L | M | M | M | M | H | H | ** | |
PR-2 | M | M | M | M | M | M | M | M | M | M | H | H | ** | |
NC-1 | M | M | M | M | M | M | M | M | L | M | ** | |||
CC-2 | H | H | H | M | M | M | M | M | L | M | ** | |||
PC | H | H | H | H | H | H | M | M | L | M | ** | |||
PB | H | H | H | H | H | H | H | H | L | L | L | L | ** | |
NPI | H | H | H | H | H | H | H | H | M | M | M | L | M | |
PI | H | H | H | H | H | H | H | H | M | M | M | L | ** | |
PM | ** | ** | ** | ** | ** | ** | ** | ** | ** | ** | ** | ** | ** | ** |
H | High Impact Screening |
M | Medium Impact Screening |
L | Low Impact Screening |
* | |
** | Per approved plan |



