[Ord. 954, 12/19/2013]
Applicants are encouraged to schedule a preapplication meeting
to review the overall stormwater management concept with Borough staff/Engineer.
The preapplication meeting is not mandatory and shall not constitute
formal filing of a plan with the Borough. Topics discussed may include
the following:
A. The developer shall provide available geological maps, plans and
other available data.
B. Findings of the site analysis, including identification of any environmentally
sensitive areas, wellhead protection areas, riparian corridors, hydrologic
soil groups, existing natural drainageways, karst features, areas
conducive to infiltration to be utilized for volume control, etc.
C. Results of infiltration tests.
D. Applicable Borough Subdivision and Land Development and/or Zoning
Ordinance provisions.
E. The conceptual project layout, including proposed structural and
nonstructural BMPs.
[Ord. 954, 12/19/2013]
Approval of an SWM site plan shall be valid for a period of one year unless extended by the Borough. Any time extensions shall not exceed four additional one-year extensions, for a total of five years. If a certificate of completion as required by § 411 of this chapter has not been submitted within the specified time period, then the Borough may consider the SWM site plan disapproved and may revoke any and all permits issued by the Borough. SWM site plans that are considered disapproved by the Borough may be resubmitted in accordance with Part
4 of this chapter.