Inspections should be conducted during or immediately following
precipitation events of three inches or more with in a twenty-four-hour
period. A written inspection report shall be created to document each
inspection. The inspection report shall contain the date and time
of the inspection, the individual(s) who completed the inspection,
the location of the BMP, facility or structure inspected, observations
on performance, and recommendations for improving performance, if
applicable. Inspection reports shall be submitted to the Borough within
30 days following completion of the inspection.
|