[Ord. No. 28-1997, § 1201.0, 3-4-1997]
No person shall build, occupy or maintain a structure in the
Aquifer-Watershed Overlay District of the City unless in compliance
with the provisions of this division.
[Ord. No. 28-1997, § 1202.0, 3-4-1997]
Existing uses or structures which are not permitted in sections
102-873,
102-874,
102-875 and
102-876 which are legally owned, occupied or maintained within the Aquifer-Watershed Over-lay District of the City on July 17, 1990, are nonconforming uses under the provisions of this chapter. Legally nonconforming uses may continue provided they do not create any significant risk of causing an adverse impact upon the quantity and/or quality of the waters of the aquifers and/or watershed of the City water supply. No nonconforming use may be changed to another nonconforming use or expanded in any way.
[Ord. No. 28-1997, § 1203.0, 3-4-1997; Ord. No. 21-2006, 2-7-2006]
Structures and uses permitted in the Aquifer Zone with Planning
Board review are as follows:
(1) New residential structures and manufactured housing units. Basements
and frost walls are permitted, provided the clay restrictive layer
is not disturbed. This must be verified by the code enforcement officer.
(2) Additions to existing dwelling. Basements and frost walls are permitted,
provided the clay restrictive layer is not disturbed. This must be
verified by the code enforcement officer.
(3) Accessory buildings. Basements and frost walls are permitted, provided
the clay restrictive layer is not disturbed. This must be verified
by the code enforcement officer.
(4) Public and private parks. Public and private parks are permitted,
with no structural development with the exception of picnic shelters
no larger than 10 feet by 10 feet.
(5) Commercial timber harvesting. As a minimum, the applicant shall provide
the Planning Board with a harvesting plan prepared by a professional
forester, and an erosion and sedimentation control plan approved by
the U.S. Soil Conservation Service. Use of a skidder is subject to
the approval of the code enforcement officer.
(6) Public utilities. Public utilities, including but not limited to
sewage collection and water treatment facilities, are permitted.
(7) Road construction. As a minimum the applicant shall provide the Planning
Board with a plan approved by the U.S. Soil Conservation Service or
by a registered professional engineer licensed by the state. For purposes
of this subsection, a driveway which does not require excavation of
more than 12 inches of the ground is not considered a road.
(8) Telecommunications facilities, if such use is permitted in the underlying
zoning district which is subject to the provisions of the Aquifer
zone overlay district.
(9) Stealth telecommunications facilities.
[Ord. No. 28-1997, § 1204.0, 3-4-1997]
Structures and uses permitted in the Aquifer Zone with approval
of the code enforcement officer are as follows:
(1) Replacement septic systems/replacement septic system variances are
permitted.
(2) Any lawfully existing residence or manufactured housing unit may
be repaired, replaced, maintained or rebuilt.
(3) Use of a skidder may be approved when its use will not cause any
significant disturbance of the surface of the ground.
(4) Commercial agriculture is permitted. As a minimum, the applicant
shall provide a plan approved by the U.S. Soil Conservation Service
or by a registered professional engineer licensed by the state.
(5) Land clearing of more than two acres is permitted. As a minimum,
the applicant shall provide the Planning Board with a plan approved
by the U.S. Soil Conservation Service or by a registered professional
engineer licensed by the state.
(6) Home occupations are permitted provided they do not create any significant
risk of causing an adverse impact upon the quantity and/or quality
of the waters of the aquifer or the City water supply.
(7) New utilities are permitted as follows:
a. Poles. The erection of new utility poles in the Aquifer Overlay is
permitted provided that:
1.
The pole does not create a significant risk of causing an adverse
impact upon the quantity and/or quality of the waters of the City
aquifer; and
2.
The location of such poles shall be a minimum of 100 feet from
any septic system. A permit for the placement of any new poles in
the aquifer shall be required.
b. Electrical transformers. No electrical transformers shall be placed
within this overlay if the transformer contains more than two parts
per million PCBs.
c. Underground utilities. No new underground utilities shall be permitted.
(8) Replacement utilities, as follows:
a. Poles. The replacement of any existing utility poles in the Aquifer
Overlay is permitted provided that:
1.
The pole does not create a significant risk of causing an adverse
impact upon the quantity and/or quality of the waters of the City
aquifer; and
2.
The pole shall be located in the same hole or immediately adjacent
to the existing pole. The utility company shall construct a clay seal
around the hole to prevent seepage into the aquifer whenever the clay
layer is penetrated. Such a seal shall be accomplished through the
use of clay whenever the clay layer is penetrated. When utility poles
are removed, a clay backfilling is allowed. In the event of an emergency
pole replacement, the utility company shall immediately notify the
City of such a replacement and apply for the proper permit on the
next business day.
b. Electrical transformers. No electrical transformer shall hereafter
be placed within this zone which contains more than two parts per
million PCBs.
[Ord. No. 28-1997, § 1205.0, 3-4-1997; Ord. No. 21-2006, 2-7-2006]
Structures and uses permitted in the Watershed Zone with Planning
Board approval are as follows:
(1) Residential dwelling units. Basements and frost walls are permitted.
(2) Accessory buildings. Accessory buildings equal to or greater than
500 square feet in area are permitted. Basements and frost walls are
permitted.
(4) Public utilities. Public utilities, including but not limited to
sewage collection and water treatment facilities, are permitted. Placement
of utility poles in the Watershed Zone shall not require a permit.
(5) Public and private parks.
(6) Road construction. As a minimum, the applicant shall provide the
Planning Board with a plan approved by the U.S. Soil Conservation
Service or by a registered professional engineer licensed by the state.
For the purposes of this subsection, a driveway which does not require
excavation of more than 12 inches of the ground is not considered
a road.
(7) Telecommunications facilities, if such use is permitted in the underlying
zoning district which is subject to the provisions of the Watershed
zone overlay district.
(8) Stealth telecommunications facilities.
[Ord. No. 28-1997, § 1206.0, 3-4-1997]
Structures and uses permitted in the Watershed Zone with approval
of the code enforcement officer are as follows:
(1) Replacement septic system/replacement septic system variance.
(2) Accessory buildings. Accessory buildings less than 500 square feet
are permitted. Basements and frost walls are permitted.
(3) Commercial agriculture. As a minimum, the applicant shall provide
a plan approved by the U.S. Soil Conservation Service or by a registered
professional engineer licensed by the state.
(4) Land clearing of more than two acres. As a minimum, the applicant
shall provide the code enforcement officer with a plan approved by
the U.S. Soil Conservation Service or by a registered professional
engineer licensed by the state.
(5) Commercial timber harvesting. As a minimum, the applicant shall provide
the code enforcement officer with a harvesting plan prepared by a
professional forester and an erosion and sedimentation control plan
approved by the U.S. Soil Conservation Service or by a registered
professional engineer licensed by the state. Use of a skidder is subject
to the approval of the code enforcement officer.
(6) Home occupations. Home occupations are permitted provided they do
not create any significant risk of causing an adverse impact upon
the quantity and/or the quality of the waters of the aquifer and/or
the watershed of the City water supply.
[Ord. No. 28-1997, § 1207.0, 3-4-1997]
An appeal of a decision of the code enforcement officer or the
Planning Board denying any application where such denial is based
on the provisions of this division shall be reviewed by the Zoning
Board of Appeals.
[Ord. No. 28-1997, § 1208.0, 3-4-1997]
(a) No land use shall be permitted which would create a significant risk
of causing an adverse impact upon the quality and/or quantity of the
waters of the aquifers and/or the watershed of the City water supply.
(b) Hazardous material shall not be used, stored or produced in the Aquifer-Watershed
Overlay District unless in compliance with all state, federal and
local regulations and laws relating thereto, including but not limited
to 38 M.R.S.A. §§ 1319, 1317 and 1362, and unless approved
by the Planning Board. The applicant shall provide the Planning Board
clear and convincing evidence that the presence of such materials
within the Aquifer-Watershed Overlay District will pose no foreseeable
likelihood of entry onto the watershed or into the water supply aquifer.
(c) No material shall be used, stored or produced in the Aquifer-Watershed
Overlay District, whether classified as hazardous material or not,
if such material could create a significant risk of causing any impact
upon the quantity and/or quality of the waters of the Aquifer-Watershed
Overlay District, unless approved by the Planning Board. The applicant
shall provide the Planning Board clear and convincing evidence that
the presence of such materials within the Aquifer-Watershed Overlay
District will pose no foreseeable likelihood of entry onto the watershed
or into the water supply aquifer.
(d) No new septic system variance shall be granted in the Aquifer-Watershed
Overlay District.
(e) The separation distance between a new well and septic systems shall
be at least 100 feet in the Aquifer-Watershed Overlay District.
(f) Gasoline/diesel fuel may be used or stored in the Aquifer-Watershed
Overlay District provided that such storage is in approved storage
containers of six or less gallons or in a tank which is an integral
part of a piece of equipment which operates on gasoline/diesel fuel.
Storage of gasoline/diesel fuel in an approved storage container securely
fastened in back of a truck is permitted.
(g) The provisions of this division shall also apply to the City and
the Belfast Water District.