The subdivider shall be responsible for the construction of
all public streets according to Village-approved street plans and
profiles. Streets shall be constructed according to Village specifications,
including but not limited to asphalt, curb and gutter, etc. The subdivider
shall pay all costs of street construction. The Village may inspect
any facet of street construction prior to acceptance. The Village
may deny the issuance of any building permit for any lot which abuts
a public street which has not been accepted by the Village.
The subdivider shall be responsible for the construction of
all sanitary sewer improvements according to Village-approved plans.
The subdivider shall pay all costs of sanitary sewer improvements.
The Village may inspect any facet of sanitary sewer construction.
The Village may deny the issuance of a building permit for any lot
affected by a sanitary sewer or lateral that is not completed according
to approved plans.
The subdivider shall be responsible for the construction of
a public water supply system according to Village-approved plans.
The subdivider shall pay all costs of public water supply improvements.
The Village may inspect any facet of water system construction. The
Village may deny the issuance of a building permit for any lot affected
by a water main or lateral that is not completed according to approved
plans.
The subdivider shall be responsible for the construction of
sidewalks or trails according to Village-approved plans. The subdivider
shall pay all costs of sidewalks and trails. The Village may inspect
any facet of sidewalk or trail construction. The Village may deny
the issuance of a building permit for any lot affected by a sidewalk
or trail that is not completed according to approved plans.
The subdivider shall be responsible for the construction of
all drainage improvements according to Village-approved drainage and
stormwater management plans and permits. The subdivider shall pay
all costs of drainage improvements. The Village may inspect any facet
of drainage and stormwater improvement construction. The Village may
deny the issuance of a building permit for any lot affected by a drainage
improvement that is not completed or not completed according to approved
plans and permits.
The subdivider shall be responsible for the grading of all streets
and lots according to Village-approved drainage and street plans and
permits. The subdivider shall pay all grading costs. The Village may
inspect any facet of grading. The Village may deny the issuance of
a building permit for any lot or lot abutting a street which is not
graded according to approved plans and permits.
The subdivider shall be responsible to implement erosion and
sediment control according to Village-approved plans and permits.
The Village may deny the issuance of a building permit for any lot
in a land division or subdivision which is not in compliance with
an approved erosion and sediment control plan and permit.
The subdivider shall be responsible for the installation of
street signs with street names, of a design approved by the Village,
at the intersections of all dedicated public streets. The subdivider
shall pay all costs of street signs.
The subdivider shall be responsible for the provision of electric
power, telephone, cable facilities and gas. The Village, in its discretion,
may require that such utilities be underground. The subdivider shall
pay for the cost of providing all utilities.
The subdivider shall be responsible for the installation of
streetlights according to Village-approved plans. The subdivider shall
pay all costs of streetlights. Streetlights shall be operable at the
time electricity is made available.
The subdivider shall pay a fee in the amount as prescribed in Chapter
40, Fees and Penalties, of this Code for street trees. The fee shall be kept by the Village in a separate account. Street trees will be planted by the Village within the street right-of-way for each lot after final grading of lots as determined by the Village.
The subdivider shall pay the reimbursable costs of subdivision
work.
The subdivider shall be responsible for subdivision contingencies
that may occur.
The subdivider shall be responsible for administrative costs
as a percentage of the subdivision project.
The subdivider shall be responsible for miscellaneous costs
related to the subdivision project.