Service
|
Fee
|
---|---|
Solicitation registration
|
$100 per person
|
Not-for-profit solicitation
|
No fee
|
Returned check fee
|
$30
|
Residential garbage license
|
$2,500
|
Commercial garbage license
|
$1,000
|
Roll-off boxes
|
$200
|
Video gaming terminal or device license
|
$500/year
|
Video gaming terminal operator
|
$1,000/year
|
Service
|
Fee
| |
---|---|---|
Annexation
| ||
Residential and nonresidential
|
No fee
| |
Zoning
| ||
Residential and nonresidential
|
$800 (map amendments)
$300 (text amendments)
| |
Variances
| ||
Residential
|
$475 flat fee
| |
Nonresidential (except for sign variances)
|
$575 flat fee + $50 ea. additional variance
| |
Sign variances
|
$300 flat fee
| |
Site Plan
| ||
Residential (attached and multifamily) and nonresidential less
than 50,000 SF buildings
|
$500 flat fee
| |
Special uses
| ||
Special use (except for outdoor seating)
|
$500
| |
Outdoor seating associated with a permitted restaurant
|
$100
| |
PUD (not subject to special use fees)
| ||
Flat fee
|
$1,000 flat fee + $50 per acre
| |
Major PUD change
|
$1,000
| |
Minor PUD change
|
$500
| |
Landscaping (staff review)
| ||
Flat fee
|
$250
| |
Plat of subdivision (preliminary and final)
| ||
0 to 10 acres
|
$1,000 flat fee + $50 per acre
| |
1.5 mile review
|
$200
| |
Plat of consolidation, minor subdivisions (less than 5 lots;
no new streets)
| ||
0 to 10 acres
|
$500
| |
Over 10 acres
|
$1,000
| |
Plat of vacation, dedication
| ||
Flat fee
|
$200
| |
Site development permit
| ||
Flat fee
|
$300
| |
Publication
| ||
All applications
|
$100 (excludes annexations)
| |
Professional services
| ||
0 to 10 acres
|
$2,000 (excludes minor PUD changes)
| |
Over 10 acres
|
$4,000 (excludes minor PUD changes)
| |
Special use permits
|
$500
| |
Variances
|
$500 (nonresidential); residential applicants shall reimburse
the Village if fees are accrued
| |
Site plan
|
$500 (excluding single-family residences)
| |
Site variances
|
$250 (excluding single-family residences)
| |
Zoning materials
| ||
Zoning Ordinance
|
$40
| |
Zoning Map
|
$10
| |
Comprehensive Plan
|
$40
| |
Application for permit to construct in right-of-way
|
$1,200
| |
Application for construction of small cell facility
| ||
First application
|
$650
| |
Each additional application to co-locate more than one small
wireless facility on existing utility poles or wireless support structures
|
$350
| |
Each small wireless facility application that includes the installation
of a new utility pole for construction
|
$1,000
| |
Inspection prior to order for removal of a stop-work order in
relation to tree preservation
|
$75/each
|
Any land vacated by the Village of Homer Glen is subject to
compensation as established by the Village of Homer Glen.
|
The sign variance application fee for sign distance and sign
relocations resulting from adjustments of the right-of-way due to
public road improvement projects is waived. A professional service
fee deposit is required from the petitioner.
|
Note 1: Fractional acres are rounded up to the next unit.
|
Note 2: The petitioner is also responsible for any professional
review fees associated with the project. These professional review
fees include legal, engineering and/or other professional review or
consulting fees, which are assessed on an hourly basis. A professional
service fee deposit is required from the petitioner.
|
Service
|
Fee
|
---|---|
Tobacco
| |
License
|
$250 nonrefundable application fee
|
Class A tobacco license
|
$650
|
Class B tobacco license
|
$1,000
|
Business
| |
Commercial license
|
$30
|
Home business license
|
$30
|
Late commercial license fee
|
$30
|
Late home business license fee
|
$30
|
Freedom of Information Act (FOIA)
| |
First 50 pages
|
Free
|
8.5 x 11 copy
|
$0.15 each
|
Oversized copy
|
Cost of production
|
Certification
|
$1 per document, plus copy cost
|
Color copy
|
$0.20 each
|
Service
|
Fee
| |
---|---|---|
Contractor registration
| ||
General contractor
|
$150
| |
General contractor with trades
|
1 year or greater than 6 months: $250
Less than 6 months: $175
| |
Subcontractor
|
1 year or greater than 6 months: $75
Less than 6 months: $50
| |
Construction manager
|
1 year or greater than 6 months: $150
Less than 6 months: $100
| |
Electrical contractor
|
Not exceeding $25/year
| |
Miscellaneous permit fees
| ||
Aboveground pool
|
$100
| |
In-ground pool
|
$300
| |
Demolition under 650 square feet
|
$100
| |
Demolition over 650 square feet
|
$200
| |
Right-of-way construction
|
$1,200
| |
Reinspection fees
| ||
1st reinspection
|
$75
| |
2nd reinspection
|
$150
| |
3rd reinspection
|
$225
| |
4th reinspection
|
$300
| |
Plan examination
| ||
401 square feet to 1,000 square feet
|
$200
| |
1,001 square feet to 2,000 square feet
|
$250
| |
2,001 square feet to 3,000 square feet
|
$300
| |
3,001 square feet to 4,000 square feet
|
$350
| |
All mobile units
|
$100
| |
Preliminary conference
|
$50
| |
Sprinkler review fees
| ||
Pipe schedule, up to 200
|
$1.75/sprinkler
| |
Pipe schedule, more than 200
|
$1.50/sprinkler
| |
Hydraulic calculation, up to 200
|
$3.50/sprinkler
| |
Hydraulic calculation, more than 200
|
$3/sprinkler
| |
Alternate fire protection systems
| ||
Carbon dioxide
|
$100 up to 105 pounds
| |
Halon
|
$100 up to 35 pounds ($2 per pound over)
| |
Dry chemical
|
$250 plus alarm fees
| |
Standpipe
|
$125 per standpipe
| |
Fire protection and alarm systems
|
$125 for the first 12,500 square feet
| |
Smoke detection review fee
|
$150
| |
Building permit fees
| ||
Residential
| ||
General
|
$9 per $1,000 construction (minimum $50 fee)
| |
All areas within outside walls
|
$100/square foot
| |
Crawl space, basement and garage
|
$50/square foot
| |
Decks
|
$10/square foot
| |
Accessory buildings
|
$25/square foot
| |
Mobile homes
|
$50/square foot
| |
Multifamily and existing structures
| ||
All areas within outside walls
|
$50/square foot
| |
Crawl space, basement and garage
|
$20/square foot
| |
Accessory buildings
|
$25/square foot
| |
Recreational buildings
|
$50/square foot
| |
Industrial and commercial and existing structures
| ||
General
|
$8.50 per $1,000 construction (minimum $50 fee)
| |
Assembly
|
$70/square foot
| |
Churches
|
$64/square foot
| |
Business
|
$60/square foot
| |
Educational
|
$60/square foot
| |
Factory and industrial
|
$50/square foot
| |
Institutional
|
$60/square foot
| |
Mercantile
|
$60/square foot
| |
Residential (hotel, other than R-3)
|
$65/square foot
| |
Storage
|
$60/square foot
| |
High hazard
|
$80/square foot
| |
Utility and miscellaneous
|
$60/square foot
| |
Signs*
|
$2/square foot
| |
Sign application fee*
|
$50
| |
Temporary/Special event sign
|
$25 per calendar year
| |
Temporary/Special event sign for non-profits
|
No charge
| |
Conversion of occupancy
| ||
Field inspection
|
$200
| |
Miscellaneous building fees
| ||
Reissuance within 6 months of initial issuance
|
75% of permit
| |
Transfer of permit
|
$50
| |
Plan revisions, interior
|
10% of original fee
| |
Lawn sprinkler system
|
$60
| |
Penalty for working without permit
|
Original permit x 3
| |
Other penalties
|
$50 to $1,000 per day and occurrence
| |
Plumbing
| ||
Per plumbing fixture
|
$15
| |
Electric service upgrades (single-family)
| ||
100 amp to 300 amp
|
$100
| |
301 amp to 400 amp
|
$200
| |
401 amp to 600 amp
|
$300
| |
Electric service upgrades (multifamily, commercial/industrial)
| ||
100 amp
|
$120
| |
200 amp
|
$120
| |
400 amp
|
$240
| |
600 amp to 800 amp
|
$300
| |
801 amp to 1,000 amp
|
$450
| |
1,001 amp to 2,000 amp
|
$600
| |
2,001 amp and over
|
$750
| |
Heating/Air conditioning
| ||
New commercial or industrial
|
$150
| |
Existing commercial or industrial
|
$75
| |
Insulation
| ||
New commercial or industrial
|
$150
| |
Existing commercial or industrial
|
$75
| |
Inspections
| ||
Property and maintenance/fire/life safety
|
$50
| |
Temporary use
| ||
First permit (for first 60 days)
|
$50
| |
Additional permit (must be continuous with first permit; maximum
total period of 6 months)
|
$25/additional 60 days
| |
Special event
| ||
Flat fee
|
No fee
|
*
|
The sign permit fee, retroactive to 9-24-2014, for sign relocations
resulting from adjustments of the right-of-way due to public road
improvement projects is waived.
|