[CC 1979 App. D, Art. 5 §A; Ord. No. 87-21 Art. V §A, 9-1-1987]
A.
In all areas of special flood hazards (Zones A, AE, A1-30, AO, AH) the following provisions are required:
1.
All new construction including manufactured homes and substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy.
2.
All new construction and substantial improvements shall be constructed with materials resistant to flood damage.
3.
All new construction and substantial improvements shall be constructed by methods and practices that minimize flood damage.
4.
All new construction and substantial improvements shall be constructed with electrical, heating, ventilation, plumbing and air-conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
5.
All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system.
6.
New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters.
7.
On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.
8.
The storage or processing of materials that are in time of flooding buoyant, flammable, explosive, or could be injurious to human, animal or plant life is prohibited.
9.
Storage of other material or equipment may be allowed if not subject to major damage by floods and firmly anchored to prevent flotation or if readily removable from the area within the time available after flood warning.
10.
That until a floodway has been designated, no development, including landfill, may be permitted within Zones Al-30 and AE on the City's FIRM unless the applicant for the land use has demonstrated that the proposed use, when combined with all other existing and reasonably anticipated uses, will not increase the water surface elevation of the one hundred (100) year flood more than one (1) foot on the average cross section of the reach in which the development or landfill is located as shown on the Flood Insurance Rate Study incorporated by reference; Article III, Section 425.070 of this Chapter.