B.
Exemption from permit requirements.
(1)
The following regulated activities are specifically exempt from the stormwater management permit and SWM site plan preparation and submission requirements articulated in § 113-31A and Articles IV and V of this chapter:
(c)
Conservation practices being installed as part of the implementation of a conservation plan written by an NRCS certified planner.
(d)
The installation of 1,000 or fewer square feet of impervious surface coverage proposed after January 6, 2014, provided that the activities meet the criteria of § 113-51B(3) and are conducted in accordance with all the requirements of this chapter.
(e)
The installation of impervious surface coverage within an area for which a prior SWM site plan has been approved that includes SWM facilities which were specifically designed to manage the proposed impervious surface coverage, provided that activities meet the criteria of § 113-51B(3) and are conducted in accordance with all the requirements of this chapter.
(f)
Domestic landscape and/or vegetable gardening.
(2)
The Township may deny or revoke any exemption pursuant to this section at any time for any project that the Township believes may post a threat to public health, safety, property or the environment.
(3)
An applicant proposing the cumulative installation of 1,000 square feet or less of impervious surface coverage after January 6, 2014, may be exempt from the design, plan submittal, and processing requirements of Articles III, IV, and V of this chapter if such applicant complies with all provisions of this § 113-51B(3). No person or activity is exempted from compliance with § 113-65 and Articles VII, VIII, and IX of this chapter. The applicant shall comply with the erosion and sediment control requirements of 25 Pa. Code Chapter 102. Exemptions do not relieve the applicant of the responsibility to secure required permits or approvals for activities regulated by any other code, law, regulation, or ordinance. Exemption shall not relieve an applicant from implementing such measures as necessary to meet compliance with any NPDES permit requirements. Any exemption based on false, misleading, or erroneous information provided by an applicant is void without the necessity of any proceedings for revocation. Any work undertaken or use established pursuant to such permit or other authorization is unlawful.
(a)
Any applicant desiring exemption from design, plan submission, and plan processing requirements shall complete an application form supplied by the Township Secretary and pay all applicable fees before commencing any regulated activities.
(4)
A person seeking to erect a high tunnel shall in all cases be required to file an application under this chapter. A person seeking exemption from this chapter on the basis that the high tunnel is exempted pursuant to the Storm Water Management Act, as amended by Act 15 of 2018,[1] shall provide all information necessary to demonstrate that the high tunnel meets the definition set forth herein and that the proposed high tunnel meets all of the following requirements:
[Added 4-15-2019 by Ord. No. 317-2019]
(a)
The high tunnel or its flooring does not result in an impervious area exceeding 25% of all structures located on the owner's total contiguous land area; and
(b)
The high tunnel meets one of the following:
[1]
The high tunnel is located at least 100 feet from any perennial stream or watercourse, public road or neighboring property line.
[2]
The high tunnel is located at least 35 feet from any perennial stream or watercourse, public road or neighboring property line and located on land with a slope not greater than 7%.
[3]
The high tunnel is supported with a buffer or diversion system that does not directly drain into a stream or other watercourse by managing stormwater runoff in a manner consistent with requirements of this chapter.
(c)
Nothing in this subsection shall be construed to exempt high tunnels from other requirements applicable under federal, state or Township ordinances, including, but not limited to, Chapter 135, Zoning.
(d)
Nothing in this subsection shall apply to impervious surfaces, including, but not limited to, driveways or parking and loading areas which may be installed in connection with the high tunnel.