[Adopted 5-13-1997 as § 5.001 of the 1997 Code; amended July 2007]
Permit fees for installation or removal of underground and aboveground storage tanks shall be as provided in the Town Fee Schedule.[2]
[1]
Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II).
[2]
Editor's Note: The Fee Schedule is on file in the Town offices.
Failure to obtain a proper permit prior to installation of a flammable liquid tank can result in a forfeiture of not less than $75 nor more than $1,000 for each day of noncompliance.