[R.O. 2012 §500.090; Ord. No. 97-8-3 §§I — II, 8-11-1997; Ord. No. 06-12-1, 12-4-2006; Ord. No. 14-07-05 §26, 7-21-2014; Ord. No. 21-09-02, 12-6-2021]
A. The
City of Excelsior Springs, Missouri, desires to have uniform standardization
in the community relating to design criteria and subdivision regulations,
and the City staff along with the current consulting engineers have
developed a Manual of Practice describing construction standards and
specifications for water and sewer main extensions and relocations,
residential streets and storm drainage and parking lots to be used
for any construction development within the City of Excelsior Springs,
Missouri.
B. The
Manual of Practice conforms to the Greater Kansas City Metropolitan
Chapter American Public Works Association Specifications and Criteria.
C. Standards
and specifications must be adaptable to new material, equipment and
methods, therefore, the staff will continue to update the Manual of
Practice as required.
D. Plan Review. To provide for equal reviews the City of Excelsior
Springs shall employ a third-party Missouri licensed professional
engineer to perform work beyond staff abilities. The applicant shall
pay the actual cost incurred by the City for these reviews. The City
may require prepayment of these fees as estimated for the particular
review.
E. "Plan set" is defined as water, sewer, street, storm drainage
and lighting plans covering the same lots.
F. Plan
set review fees for all public elements shall be as listed in the
Schedule of Fees, Title I, Appendix A.