A.
General requirements. No person shall do any work within a County right-of-way without first obtaining a permit from the County. Such permit shall be transferable upon application to the County and it may be revoked if any provisions thereof, or any provisions of this chapter, are violated. Willful refusal of any permittee to stop construction after receiving notice of such revocation shall be deemed a violation of this chapter. Before a permit is issued, the following requirements for application, bond, fee, plans, and right-of-way must be met.
B.
Permit application. Application for permit shall be made on forms provided by the County and, when required by the County, shall be accompanied by special specifications peculiar to the scope of work covered by the permit and suitable tracings of detailed plans of the work.
C.
Right-of-way. If subdivision approval is applied for lots abutting road rights-of-way which are less than standard width for the proposed type of roadway, the developer will be required to dedicate the additional right-of-way and slope easements necessary to obtain the necessary width as to the portion of same that the development fronts on.
D.
Alternate standards. Upon determination by the Highway Engineer that the standards and specifications are not feasible or practicable for a particular project, he may require such alternate or additional standards and specifications in accordance with good engineering principles as may be deemed necessary, and such alternate or additional requirements shall be part of and a condition of the permit.
E.
Permit expiration. Such permit shall expire, as stated on the permit, unless extended in writing by the County stating the reasons for extension. It shall be the responsibility of the permittee to apply for an extension prior to the expiration of the permit. The permittee shall notify the Highway Engineer within two days of the date the work commences.