The peak rate of stormwater discharge from upstream and off-site
locations for both the ten- and one-hundred-year-frequency storm event
shall be included in detailed engineering drawings and specifications.
Stormwater runoff conveyed by watercourses and conveyed via overland
flow shall be determined.
Engineering design standards approved by the Township shall
be the basis for the Township Engineer's review of engineering
drawings and specifications.