A.
For any of the activities regulated by this Part 2, unless preparation of a stormwater management (SWM) site plan is specifically exempted, the preliminary or final approval of subdivision and/or land development plans, the issuance of any building or occupancy permit, the commencement of any earth disturbance activity may not proceed until the property owner or applicant or his/her agent has received written approval from the municipality of a SWM site plan that demonstrates compliance with the requirements of this Part 2, and a written approval of an adequate erosion and sediment (E&S) control plan from the municipality or County Conservation District when required.
B.
The SWM site plan approved by the municipality shall be on site throughout the duration of the regulated activity.
C.
The municipality may, after consultation with the Department of Environmental Protection (DEP), approve measures for meeting the state water quality requirements other than those in this Part 2, provided that they meet the minimum requirements of, and do not conflict with, state law, including but not limited to the Clean Streams Law.[1]
D.
For all regulated earth disturbance activities, E&S control best management practices (BMPs) shall be designed, implemented, operated and maintained during the regulated earth disturbance activities (e.g., during construction) to meet the purposes and requirements of this Part 2 and to meet all requirements under Title 25 of the Pennsylvania Code and the Clean Streams Law.[2] DEP regulations require an erosion and sediment control plan for any earth disturbance activity of 5,000 square feet or more, under 25 Pa. Code § 102.4(b). In addition, under 25 Pa. Code Chapter 92,[3] a DEP "NPDES construction activities" permit is required for regulated earth disturbance activities. A copy of the erosion and sediment control plan and any required permit, as required by DEP regulations, shall be available on the project site at all times. Various BMPs and their design standards are listed in the Erosion and Sediment Pollution Control Program Manual (E&S Manual), No. 363-2134-008 (April 15, 2000), as amended and updated.
E.
For all regulated activities, implementation of the water volume controls in § 172-60 is required.
F.
Impervious areas:
(1)
The measurement of impervious areas shall include all of the impervious areas in the total proposed development even if development is to take place in stages.
(2)
For development taking place in stages, the entire development plan must be used in determining conformance with this Part 2.
(3)
For projects that add impervious area to a parcel, §§ 172-57 through 172-62 shall apply to the total impervious area within the limits of earth disturbance.
G.
Stormwater discharges onto adjacent property shall not be created, increased, relocated, or otherwise altered without written notification of the adjacent property owner(s). Such stormwater discharges shall be subject to the requirements of this Part 2.
H.
All regulated activities shall include such measures as necessary to:
(1)
Protect health, safety and property;
(2)
Meet the water quality goals of this Part 2 by implementing measures to:
(a)
Minimize disturbance to floodplains, wetlands, and wooded areas.
(b)
Maintain or extend riparian buffers.
(c)
Avoid erosive flow conditions in natural flow pathways.
(d)
Minimize thermal impacts to waters of this commonwealth.
(e)
Disconnect impervious surfaces by directing runoff to pervious areas, wherever possible.
(3)
To the maximum extent practicable, incorporate the techniques for low-impact development practices described in the Pennsylvania Stormwater Best Management Practices Manual (BMP Manual).
I.
The design of all facilities over karst shall include an evaluation of measures to minimize adverse effects.
J.
Infiltration BMPs should be dispersed on site, made as shallow as practicable, and located to maximize use of natural on-site infiltration features while still meeting the other requirements of this Part 2.
K.
Storage facilities should completely drain both the volume control and rate control capacities over a period of time not less than 24 and not more than 72 hours from the end of the design storm.
L.
The design storm precipitation amounts to be used in the analysis of peak rates of discharge shall be those from the upper limits of the 90% confidence intervals for the twenty-four-hour precipitation events in the Precipitation-Frequency Atlas of the United States, Atlas 14, Volume 2, Version 3.0, United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), National Weather Service (NWS), Hydrometeorological Design Studies Center (HDSC), Silver Spring, Maryland. NOAA's Atlas 14 can be accessed at http://hdsc.nws.noaa.gov/hdsc/pfds/.
M.
N.
Various BMPs and their design standards are listed in the BMP Manual.
O.
Any stormwater facility located on state highway rights-of-way shall be subject to approval by the Pennsylvania Department of Transportation (PennDOT), and shall require an agreement to indemnify and hold harmless the Township and PennDOT from any adverse consequences or costs.
P.
Any stormwater management facility (i.e., detention basin BMP) designed to store runoff and requiring a berm or earthen embankment required or regulated by this Part 2 shall be designed to provide an emergency spillway to handle flow up to and including the one-hundred-year proposed conditions. The height of embankment must be set as to provide a minimum 1.0 foot of freeboard above the maximum pool elevation computed when the facility functions for the one-hundred-year proposed conditions' peak inflow. Should any stormwater management facility require a dam safety permit under Pennsylvania Code Title 25, Environmental Protection, Chapter 105, Dam Safety and Waterway Management, the facility shall be designed in accordance with Chapter 105 and meet the regulations of Chapter 105 concerning dam safety which may be required to pass storms larger than the one-hundred-year event.
Q.
Any facilities that constitute water obstructions (e.g., culverts, bridges, outfalls, or stream enclosures), and any work involving wetlands as directed in DEP Chapter 105 regulations (as amended or replaced from time to time by DEP)[6] shall be designed in accordance with Chapter 105 and will require a permit from DEP. Any other drainage conveyance facility that does not fall under Chapter 105 regulations must be able to convey, without damage to the drainage structure or roadway, runoff from the twenty-five-year design storm with a minimum 1.0 foot of freeboard measured below the lowest point along the top of the roadway. Roadway crossings located within designated floodplain areas must be able to convey runoff from a one-hundred-year design storm with a minimum 1.0 foot of freeboard measured below the lowest point along the top of the roadway. Any facility that constitutes a dam as defined in DEP Chapter 105 regulations may require a permit under dam safety regulations. Any facility located within a PennDOT right-of-way must meet PennDOT minimum design standards and permit submission requirements.
R.
Any drainage/conveyance facility and/or channel that does not fall under Chapter 105 regulations[7] must be able to convey, without damage to the drainage structure or roadway, runoff from the ten-year design storm. Conveyance facilities to or exiting from stormwater management facilities (i.e., detention basins) shall be designed to convey the design flow to or from that structure. Roadway crossings located within designated floodplain areas must be able to convey runoff from a one-hundred-year design storm. Any facility located within a PennDOT right-of-way must meet PennDOT minimum design standards and permit submission requirements.
S.
Storm sewers must be able to convey proposed conditions' runoff from a ten-year design storm without surcharging inlets, where appropriate.
T.
Adequate erosion protection shall be provided along all open channels and at all points of discharge.
U.
Detention facilities will be designed as follows:
(1)
The emergency spillway on detention facilities shall be designed to convey the one-hundred-year storm after development with one foot of freeboard to the top of berm elevation. Emergency spillways shall be constructed with a suitable liner, as determined by the Township Engineer, designed in accordance with the manufacturer's specifications, backfilled with topsoil and seeded to protect the berm against erosion.
(2)
Basins and all other types of BMPs shall be naturalized with landscaping as recommended in DEP's Best Management Practices Manual as last revised. The plantings shall be in addition to all other landscaping requirements.
(3)
Two antiseep collars shall be installed around the basin outlet pipe and shall be centered within the normal saturation zone of the berm. The antiseep collars and their connections to the pipe barrel shall be watertight.
(4)
The minimum basin berm width at the design elevation shall be 10 feet. A cutoff trench (keyway) of impervious material shall be provided under all embankments that require fill material. The cutoff trench shall be a minimum of eight feet wide, three feet deep and have side slopes of one horizontal to one vertical.
(5)
Any stormwater basin that is intended to maintain a permanent pool shall be designed in accordance with DEP's Pennsylvania Best Management Practices Manual as last revised. All wet basins shall have a ten-foot-wide safety bench, be planted with wet-tolerant vegetation as approved by the Township Engineer and Township Landscape Architect, provide a minimum pond depth of four feet and be lined with clay or other impermeable liner and provide safety bench planting soil above the liner. Additionally, aerators shall be installed in all basins that are designed to maintain a permanent pool.
(6)
When an applicant retains ownership of any stormwater management facility, such entity shall be responsible for repair and maintenance of the facility. The site plan shall contain a notation permitting access to such facilities deemed critical to public welfare, for inspection at any reasonable time by the Township or its designee.
(7)
The site plan shall also contain a notation that states the approval of the final plans is conditioned upon the applicant agreeing to be responsible for all repairs and maintenance of the stormwater management facility and permitting access to such facilities deemed critical to public welfare, for inspection at any reasonable time by the Township or its designee. The failure of the applicant to properly maintain any stormwater management facility shall be construed to be a violation of this Part 2 and shall be declared to be a public nuisance, subjecting the violator to any and all penalties provided by law.
V.
Location, maintenance and responsibility for detention facilities.
(1)
Detention basins may be located on individual lots if approved by the Township. The maintenance and ownership of these basins will be the responsibility of the lot owner. The responsibility for maintenance of any such basin shall be clearly noted on the subdivision plans and shall appear on any deed conveying said lot from developer to another party.
(2)
Detention basins may be located to serve multiple lots. In this case, the ownership, maintenance and responsibility of the basin may be either that of a homeowners' association or lot owners' association. The responsibility for maintenance of any such basin shall be clearly noted on the subdivision plans and shall appear on any deed conveying said lot from the developer to another party.
(3)
Lower Moreland Township will not accept ownership of detention facilities.
(4)
Lower Moreland Township may require the developer and owner to execute an agreement promising to maintain any stormwater facility and granting access to the Township to inspect any such facility.
W.
Underground detention facilities will be permitted if they meet the following criteria:
(1)
Unless otherwise agreed by the Board of Commissioners, underground detention basins shall be located outside of all public rights-of-way.
(2)
Underground detention basins shall be constructed of high-density corrugated polyethylene pipe or approved equal.
(3)
Inlets or storm manhole structures with steps shall be located at each corner of the underground basin to provide access for maintenance.
(4)
A minimum one foot of freeboard shall be provided between the one-hundred-year water surface elevation and the top of all inlet grates or manhole rims.
(5)
The underground basin shall be wrapped in permeable geotextile fabric.
(6)
Backfill between the top of the underground basin and the bottom of the pavement section, or the bottom of the topsoil layer in unpaved areas, must be full stone backfill.
(7)
When infiltration rates exceed the acceptable values in the Pennsylvania Best Management Practices Manual, as last revised, a twelve-inch-thick sand filter layer, wrapped in geotextile fabric, should be provided for additional water quality treatment.
(8)
An emergency overflow weir shall be provided for the outlet structure in order to convey basin inflow in excess of design flows or in the event the outlet structure becomes blocked and is unable to convey the design flow. The minimum capacity of the emergency overflow weir shall be equivalent to the one-hundred-year peak inflow rate for the post-development design storm.
(9)
Proposed site improvements and grading downstream of the underground detention basin shall be designed to convey the one-hundred-year peak inflow rate to a natural outfall, storm sewer system or other drainage facility, without adversely affecting downstream properties.
(10)
Underground stormwater facilities that receive runoff from more than one lot within a residential community shall require the creation of a homeowners' association (HOA). The HOA will be responsible for the ownership and continued maintenance of the underground facility.
X.
Detention/retention facility design and construction standards:
(1)
Detention basins shall be designed to facilitate regular maintenance, periodic mowing and periodic silt removal and reseeding. Shallow broad basins are preferred to steep-sided basins.
(2)
The maximum slope of the earth and detention basin embankment shall be three to one, with the exception that any slope to be maintained by the Township shall be four to one. The top or toe of any slope shall be located a minimum of five feet from a property line. Whenever possible, the side slope and basin shape shall conform to the natural topography.
(3)
Unless permitted by the Zoning Hearing Board in accordance with Chapter 108, "Floodplain Conservation and Damage Prevention," detention basins shall not be located within floodplains.
(4)
If retention basins are used, the applicant shall demonstrate that such ponds are designed to protect public health, safety and welfare.
(5)
The minimum top width of the detention basin berm shall be 10 feet. A cutoff trench (keyway) of relatively impervious material shall be provided beneath all embankments requiring fill material. The keyway shall be a minimum eight feet wide, minimum three feet deep and have one-to-one side slopes.
(6)
In order to ensure proper drainage on the basin bottom, a minimum grade of 2% shall be maintained for sheet flow. Where a slope of 2% cannot be maintained, infiltration channels or trenches will be required and shall be constructed between all basin inlets and the basin outlet.
(7)
All detention and retention basin embankments shall be placed in eight-inch maximum lifts to a minimum dry density of 95%. Prior to proceeding to the next lift, compaction shall be checked by the Township Engineer or an approved soils engineer, who shall provide the Township Engineer with a written report. Compaction tests shall be performed using the Modified Proctor Method in accordance with ASTM D-1557. Compaction tests shall be run on the leading and trailing edge as well as the top of the berm.
(8)
Emergency overflow facilities shall be provided for detention facilities to accommodate runoff in excess of design flows. Whenever possible, emergency spillways for the detention basins shall be constructed on undisturbed ground. Emergency spillways shall be constructed of concrete pavers, gabions or other similar materials approved by the Township Engineer. All emergency spillways shall be constructed so that the detention basin berm is protected against erosion. The construction material of the emergency spillway shall extend along the upstream and downstream berm embankment slopes. The downstream slope of the spillway shall, as a minimum, extend to the toe of the berm embankment. The emergency spillway shall not discharge over earthen fill or easily erodible material.
(9)
Antiseep collars shall be installed around the pipe barrel within the normal saturation zone of the detention basin berms. The antiseep collars and their connections to the pipe barrels shall be watertight. The antiseep collars shall extend a minimum of two feet beyond the outside of the principal pipe barrel. The maximum spacing between collars shall be 14 times the minimum projection of the collar measured perpendicular to the pipe. A minimum of two antiseep collars shall be installed on each outlet pipe.
(10)
All outlet pipes through the basin berm shall be reinforced concrete pipe, designed to withstand the loading caused by a fully saturated berm, and shall have watertight joints using zero-ring joint pipe. Outlet pipe shall be backfilled with material similar to the core material (semi-impervious).
(11)
The invert of the inlet pipe(s) into a basin shall be six inches above the basin floor or lining so that it can adequately drain after rainstorms. Inlet pipe(s) shall discharge to areas of the basin that slope toward the outlet structure.
(12)
Energy dissipaters and/or level spreaders shall be installed at points where pipe, or drainageways drain to or from the basin. Energy dissipaters shall comply with the Montgomery County Soil Conservation District/Department of Environmental Protection criteria. NCRS energy-dissipating device calculations shall be submitted for Township Engineer review and approval.
(13)
Inlet and outlet structures shall be located at a maximum distance from one another in order to promote water quality benefits. The Township Engineer may require sediment trap devices for entrapping sediments carried in stormwater if sufficient separation of inlet and outlet structures cannot be achieved.
(14)
A perforated riser or similar sediment control device shall be provided at each outlet of all detention basins during construction for sediment control. The riser shall be constructed of metal or concrete. The riser shall extend to a maximum elevation of one foot below the crest elevation of the emergency spillway. The perforated riser shall be designed so that the rate of outflow is controlled by the pipe barrel through the basin berm when the depth of water within the basin exceeds the height of the riser. Circular perforations with a maximum diameter of one inch shall be spaced 12 inches vertically. The horizontal spacing shall be in accordance to DEP Soil Erosion and Sedimentation Control Manual specifications. The perforations shall be clearly cut and shall not be susceptible to enlargement. All metal risers shall be suitably coated to prevent corrosion. A trash rack or similar appurtenance shall be provided to prevent debris from entering the pipe. All risers shall have a concrete base attached with a watertight connection. The base shall be of sufficient weight to prevent flotation of the riser. An antivortex device consisting of a thin vertical plate normal to the base and berm shall be provided at the top of the riser. Unless this structure is part of the permanent outlet control, it shall be removed from the site when the site has been adequately stabilized, as determined by the Township Engineer.
(15)
All drainage channels shall be designed to prevent erosion of the bed and batiks. The maximum permissible flow velocity shall not exceed the design requirements outlined in the current Design Manual published by the Pennsylvania Department of Environmental Protection. Suitable stabilization shall be provided where required to prevent erosion of the drainage channels.
(16)
Any vegetated drainage channel requiring mowing of the vegetation shall have a maximum grade of three horizontal to one vertical on those areas to be mowed.
(17)
Because of the critical nature of vegetated drainage channels, the design of all vegetated channels shall, as a minimum, conform to the design requirements outlined in the current Design Manual published by the Pennsylvania Department of Environmental Protection.
Y.
Stormwater conveyance system design and construction standards:
(1)
Storm sewers, culverts, bridges and related installation shall be provided to:
(a)
Permit unimpeded flow of natural watercourses and in such a manner as to protect the natural character of the watercourses and to provide regulated discharge.
(b)
Ensure adequate drainage of all low points along the line of streets,
(c)
Intercept stormwater runoff along streets at intervals reasonably related to the extent and grade of the area drained and to prevent substantial flow of water across intersections.
(2)
All storm sewer system components shall conform to current PennDOT standards.
(3)
Drainage structures which drain watershed areas in the excess of 1/2 square mile (320 acres) or which have a span of eight feet or more shall be designed using the Natural Resources Conservation Service Technical Release 55, Urban Hydrology for Small Watersheds.
(4)
If a water obstruction permit is required from the Pennsylvania Department of Environmental Protection, the design storm shall be a one-hundred-year storm.
(5)
The culvert or bridge shall be as wide as the ultimate width of the roadway. Additional width may be required to provide sidewalks on one or both sides of the cartway.
(6)
Storm sewer design and construction requirements:
(a)
Minimum pipe size is 18 inches.
(b)
Minimum pipe slope shall be 0.5% per foot.
(c)
Minimum drop across junctions shall be two inches. At changes in pipe diameter, pipe crowns shall be matched at junctions (manhole, inlet or junction box).
(d)
Maximum distance between junctions shall be 300 feet.
(e)
Runoff to proposed storm sewers and inlets shall be calculated using the Rational Method.
(f)
The time of concentration shall be assumed to be five minutes for pipes under 30 inches. For pipes 30 inches or greater, the calculated time of concentration can be utilized.
(g)
The time of concentration to inlets for grate capacity calculations shall be assumed to be five minutes.
(h)
All storm sewer pipes shall be designed at a minimum to accommodate a minimum of a ten-year storm.
(i)
The one-hundred-year storm shall be transported to the basin. The plans shall reflect this requirement as required by the Township Engineer.
(j)
All storm sewer pipes at inlets in sump condition shall be designed to accommodate the fifty-year storm.
(k)
All storm sewer pipes and inlets intended to drain to detention facilities shall be designed to accommodate the one-hundred-year storm if the bypass or overflow runoff will not reach the basin by overland flow.
(l)
All inlets in sump condition shall be six-foot inlets or dual four-foot inlets, separated by eight feet, as needed.
(m)
All storm sewer systems shall be analyzed for both inlet and outlet control (including tailwater effects) by using the equations and nomographs as shown in the FHA's Hydraulic Design Services No. 5. In lieu of this, computer programs that calculate the actual hydraulic grade line for the storm sewer system can be used, provided that all losses (friction, bend, junction, etc.) are taken into account. Documentation for the program must be submitted for approval.
(n)
Minimum cover over pipes shall be two feet from the top of the outside of pipe bell to the final grade.
(o)
Inlet capacities shall be calculated using PennDOT or manufacturer's nomographs. Documentation for manufacturer's nomograph must be provided to the Township Engineer.
(p)
All stormwater pipes must be reinforced concrete pipe (RCP), high-density polyethylene pipe (HDPE) or other equivalent material approved by the Township Engineer.