When the land to be subdivided lies within three miles of the corporate limits of the City, the subdivider shall proceed as specified in §§
392-21 through
392-24, except:
A. Sketch or map not required. A sketch or preliminary map for a certified
survey map is not required to be approved by the Plan Commission prior
to filing a certified survey map.
B. Transmittal responsibility. The Town or County Clerk or county planning
agency to whom the plat or certified survey map is first submitted
shall be responsible for transmitting copies of the plat or map to
designated objecting agencies and the subdivider shall indicate which
one in his application.
C. Approval agencies. Approval agencies include the Common Council,
Town Board and County Park and Plan Commission or County Board and
the subdivider shall comply with the land division ordinances of these
agencies.
D. Installation of improvements. The subdivider may proceed with the
installation of such improvements and under such regulations as the
town board of the town within whose limits the plat lies may require.
Wherever connection to any City utility is desired, permission for
such connection shall be approved by the Common Council.
E. Improvement requirements. All improvement requirements specified
by the town board or any special improvement district in matters over
which they have jurisdiction shall be met before filing of the final
plat.
A condominium plat prepared under § 703.11, Wis. Stats., shall be reviewed in the same manner as a subdivision plat under §§
392-21 through
392-23 of this chapter.