Special permits shall be granted by the special permit granting authority for building-integrated wind energy facilities that meet the criteria outlined in this division. The construction of a building-integrated wind energy facility shall be permitted in the following zoning districts: Industrial Park Districts (IP); Open Space/Recreational Districts (OS); and Water Resource Districts (WR), subject to the issuance of a permit and provided that the use complies with all requirements set forth in this division.
A. Special permit granting authority. No building-integrated wind energy facility shall be erected, constructed, installed or modified as provided in this section without first obtaining a special permit from the special permit granting authority. The construction of a building-integrated wind energy facility shall be permitted subject to the issuance of a special permit and provided that the use complies with all requirements set forth in this division. All such wind energy facilities shall, where economically feasible, be constructed and operated in a manner that minimizes adverse visual, safety and environmental impacts.
B. Required supporting documentation for building-integrated wind energy facilities. The special permit application submitted to the special permit granting authority shall, at a minimum, include:
(1) Analysis and design documents, completed by a structural engineer registered in the Commonwealth of Massachusetts, demonstrating that the proposed building is structurally sufficient to support the permanent installation of the proposed building-integrated wind energy facility. At a minimum, the analysis must address vibration, wind load and ice load.
(2) Elevation drawings of building with building-integrated wind energy facility installed, viewed from north, south, east and west.
(3) Building schematic detailing point(s) of connection and associated supports for the building-integrated wind energy facility.
(4) Schematic of attachment method for connecting the building-integrated wind energy facility to the building.
(5) Specification sheets for wind turbine and all related components (inverters, controllers, disconnects, etc.).
(6) One- or three-line electrical diagram detailing wind turbine, associated components, and electrical interconnection methods, with all NEC-compliant disconnect and overcurrent devices.