Street Type
|
Required Widths
(in feet)
| ||
---|---|---|---|
Minor streets and permanent culs-de-sac
| |||
Right-of-way
|
56
| ||
Cartway
|
36
| ||
Collector street
| |||
Right-of-way
|
60
| ||
Cartway
|
40
| ||
Arterial street
| |||
Right-of-way
|
As specified in the official plans or as determined after consultation
with the Borough and PennDOT
| ||
Cartway
| |||
Marginal access street
| |||
Right-of-way
|
As determined after consultation with the Borough and PennDOT,
but not less than 33
| ||
Cartway
|
24
| ||
Service street
| |||
Right-of-way
|
24
| ||
Cartway
|
24
|
Design Speed
(in miles per hours)
|
Minimum Center line Radius
(in feet)
| ||
---|---|---|---|
20
|
100
| ||
25
|
150
| ||
30
|
230
| ||
35
|
310
| ||
40
|
430
| ||
45
|
550
| ||
50
|
700
| ||
55
|
850
|
Design Speed
(in miles per hours)
|
Minimum Sight Distance
(in feet)
| ||
---|---|---|---|
20
|
125
| ||
25
|
150
| ||
30
|
200
| ||
35
|
250
| ||
40
|
325
| ||
45
|
400
| ||
50
|
475
| ||
55
|
550
|
Design Speed of Approaching Street with No Stop or Signal
Control
(in miles per hour)
|
Minimum Stopping Distance (in feet) Required Unless Alternative
permitted by Borough Council
|
Alternative Stopping Distance (in feet) Permissible at
discretion of Borough Council only on lightly travelled highways where
the removal of sight obstructions would be costly
|
---|---|---|
20
|
125
|
90
|
25
|
150
|
110
|
30
|
200
|
130
|
35
|
250
|
155
|
40
|
325
|
180
|
45
|
400
|
200
|
50
|
475
|
220
|
55
|
550
|
240
|
Design Speed of Street being Approached by Vehicle on
Stop Control Street
(in miles per hour)
|
Minimum Sight Distance Required
(in feet)
| |
---|---|---|
20
|
200
| |
25
|
250
| |
30
|
300
| |
35
|
350
| |
40
|
400
| |
45
|
450
| |
50
|
500
| |
55
|
550
|
For calculating sight distance, refer to A Policy on Geometric
Design of Highways and Streets, AASHTO, 1984 edition.
|
Width in Feet Minimum
|
Maximum
| ||
---|---|---|---|
1-Way
|
12
|
24
| |
2-Way
|
24
|
36
|
Storm Event
|
Inches Rainfall
| |
---|---|---|
2-year
|
3.0
| |
10-year
|
4.6
| |
25-year
|
5.6
| |
50-year
|
6.6
| |
100-year
|
7.5
|
1.
|
"I CERTIFY THAT THE PLAN OF DEVELOPMENT AND THE PLAN FOR SOIL
EROSION AND SEDIMENT CONTROL MEET THE REQUIREMENTS, STANDARDS AND
SPECIFICATIONS OF THE COUNTY CONSERVATION DISTRICT."
| ||
---|---|---|---|
Engineer for developer
|
Date
|
2.
|
"I CERTIFY THAT ALL CONSTRUCTION AND/OR DEVELOPMENT WILL BE
DONE AS DESCRIBED BY THIS PLAN OF DEVELOPMENT AND THE PLAN FOR SOIL
EROSION AND SEDIMENT CONTROL, INCLUDING THE NARRATIVE REPORT."
| ||
---|---|---|---|
Developer
|
Date
|