For all activities regulated by this chapter, the steps below
shall be followed for submission. For any activities that require
a PADEP joint permit application and regulated under Chapter 105 (Dam
Safety and Waterway Management) or Chapter 106 (Floodplain Management)
of PADEP's Rules and Regulations, require a PENN DOT highway
occupancy permit, or require any other permit under applicable state
or federal regulations, the permit(s) shall be part of the plan.
A. The drainage plan shall be submitted by the developer as part of
the preliminary plan submission for the regulated activity.
B. Four copies of the drainage plan and stormwater management report
shall be submitted.
C. Distribution of the drainage plan will be as follows:
(1)
Two copies to the Township accompanied by the requisite municipal
review fee, as specified in this chapter.
(2)
One copy to the Township Engineer.
(3)
One copy to the County Planning Commission/Department.
A disapproved drainage plan may be resubmitted, with the revisions addressing the Township Engineer's concerns documented in writing, to the Township Engineer in accordance with §
173-403 of this chapter and be subject to review as specified in §
173-404 of this chapter. The applicable municipal review fee must accompany a resubmission of a disapproved drainage plan.