Stormwater management controls and facilities as defined here
include all structural and nonstructural stormwater conveyance and
management controls including water quantity and quality best management
practices.
The applicant should provide a financial guarantee to the Township
for the timely installation and proper construction of all stormwater
management controls as required by the approved stormwater plan and
this chapter equal to the full construction cost of the required controls.