The governing body may change or supplement the floodplain zoning district boundaries and this chapter in the manner provided by law. Actions which require an amendment include, but are not limited to, the following:
A.
Any change to the Official Floodplain Zoning Map, including the floodway line or boundary of any floodplain area.
B.
Correction of discrepancies between the water surface profiles and Floodplain Zoning Maps.
C.
Any fill in the floodplain which raises the elevation of the filled area to a height at or above the flood protection elevation and is contiguous to land lying outside the floodplain.
D.
Any fill or floodplain encroachment that obstructs flow, increasing regional flood height 0.01 foot or more.
E.
Any upgrade to a floodplain zoning ordinance text required by § NR 116.05, Wis. Adm. Code, or otherwise required by law or for changes by the municipality.
F.
All channel relocations and charges to the maps to alter floodway lines or to remove an area from the floodway or the flood-fringe that is based on a base flood elevation from a FIRM requires prior approval by FEMA.