[Ord. 524, 12/15/2010, § 701]
1. Easements shall be established to accommodate the existence of drainageways.
2. Easements shall be established for all on-site stormwater management
or drainage facilities, including but not limited to: detention facilitates
(above or below ground), infiltration facilities, all stormwater BMPs,
drainage swales, and drainage facilities (inlets, manholes, pipes,
etc.).
3. Easements are required for all areas used for off-site stormwater
control.
4. All easements shall be a minimum of 20 feet wide.
5. Easements shall provide ingress to and egress from a public right-of-way.
In lieu of providing an easement to the public right-of-way, a note
may be added to the plan granting the Township or their designees
access to all easements via the nearest public right-of-way.
6. Where possible, easements shall be centered on side and/or rear lot
lines.
7. The following note shall be placed on the recorded plan: "Nothing
shall be planted or placed within the easement which would adversely
affect the function of the easement, or conflict with any conditions
associated with such easement."
8. A note shall be placed on the SWM site plan identifying the party
responsible for assuring the continued functionality and required
maintenance of any easement.