Stormwater and all other unpolluted drainage shall be discharged
to such sewers as are specifically designated as combined sewers or
storm sewers or to a natural outlet approved by the Commissioner.
Industrial cooling water or unpolluted process waters may be discharged,
upon approval of the Commissioner, to a storm sewer, combined sewer
or natural outlet. Dischargers of cooling water to state waters must
apply for a SPDES permit.
No user shall ever increase the use of process water, or in
any way attempt to dilute a discharge, as a partial or complete substitute
for adequate treatment to achieve compliance with a discharge limitation
unless expressly authorized by an applicable pretreatment standard
or pretreatment requirement. The Commissioner may impose mass limitations
on users who are using dilution to meet applicable pretreatment standards
or Requirements, or in other cases when the imposition of mass limitations
is appropriate.
When required by the Commissioner, the owner of any property
served by a building sewer carrying industrial wastes shall install
a suitable control manhole in the building sewer to facilitate observation,
sampling and measurement of the wastes. Such manhole, when required,
shall be accessibly and safely located and shall be constructed in
accordance with plans approved by the Commissioner. The manhole shall
be installed by the owner at his expense and shall be maintained by
him so as to be safe and accessible at all times.