Fees shall be established by the Borough to defray plan review and construction inspection costs incurred by the Borough. All fees shall be paid by the applicant at the time of drainage plan submission. A review and inspection fee schedule shall be established by resolution of the Borough Council based on the size of the regulated activity and based on the Borough's costs for reviewing drainage plans and conducting inspections pursuant to §
264-26. The Borough shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
The fees required by this chapter shall at a minimum cover:
B. The review of the drainage plan by the Borough and the Municipal
Engineer shall be billed at the current hourly billing rate of the
Engineer.
C. The site inspections shall be billed at the current hourly billing
rate of the Engineer.
D. The inspection of stormwater management facilities and drainage improvements
during construction shall be billed at the current hourly billing
rate of the Engineer.
E. The final inspection upon completion of the stormwater management
facilities and drainage improvements presented in the drainage plan
shall be billed at the current hourly billing rate of the Engineer.
F. Any additional work required to enforce any permit provisions regulated
by this chapter, correct violations, and assure proper completion
of stipulated remedial actions shall be billed at the current hourly
billing rate of the Engineer.