A.
Intent. The zoning districts established by this chapter are designed to guide future use of land in the Township by encouraging the development of desirable residential, commercial and industrial areas with appropriate groupings of compatible and related uses and to the end of promoting and protecting the public health, safety, comfort, prosperity and other aspects of the general welfare. It is also fundamental to the purpose of this chapter to recognize that many existing lots throughout the Township may be less adequate than others because of their location, size, odd shape, difficult topography, or any combination of these limitations. Alleviation of proven hardships on these lots is made available through variance application to the Zoning Hearing Board created herein.
B.
Approach. To achieve the stated intent, lawful existing uses which would be prohibited or restricted under the terms of this chapter, or future amendments, and which do not conform to the character and regulations of the zoning district in which they are located, shall be subject to certain limitations. The regulations set forth below are intended to provide a gradual remedy for the undesirable conditions resulting from indiscriminate mixing of uses and to afford a means whereby nonconforming uses can be gradually eliminated and reestablished in more suitable locations within the Township. Similarly, buildings or other structures which do not comply with one or more of the applicable developmental standards in which they are located are deemed to be nonconforming. The Township Zoning Office will respond in writing, at the request of a nonconforming property owner, to any lending institution, title company, or real estate company to verify or confirm the legal nonconforming status of a property up for sale or refinancing.
C.
Avoidance of undue hardship. To avoid undue hardship, nothing in this chapter shall be deemed to require a change in plans, construction or intended use of any structure on which actual construction was lawfully begun prior to the effective date or amendment of this chapter and on which actual construction has been carried on diligently. Where demolition or removal of an existing structure has been substantially begun prior to rebuilding, such demolition or removal shall be deemed to be construction, provided that the work shall have been carried on diligently. All permits for structures or uses issued prior to the adoption of this chapter are declared void 90 days from the effective date of this chapter, unless:
(1)
Substantial construction shall have been commenced or use implemented; or
(2)
Written contracts have been entered into pursuant to said permit by which substantial legal rights have accrued. This subsection is applicable only if such construction or use does not conform to the provisions of this chapter.
D.
Illegal uses. Illegal uses existing at the time this chapter is enacted shall not be validated by virtue of its enactment. The benefit of legal nonconforming use status is available only for a lawful use which existed on the land when this chapter took effect, and it is the burden of the party alleging the existence of a nonconforming use to establish both its existence and legality at the time before enactment of this chapter.