The connection of existing properties or proposed land development
to an existing or proposed sewage system through the use of a pressurized
system shall occur only after either:
A. An Official Plan revision to the Township's Act 537 Plan designating
the proposed properties to be served by the pressurized system has
been approved by the Authorities, as applicable, and the DEP; or
B. A DEP-approved exemption from the Official Plan revision has been
obtained by the property owner.
The Township reserves the right to, and may from time to time,
adopt, revise, amend and readopt such rules and regulations as it
deems necessary and proper for the use, operation and maintenance
of pressurized systems within the Township, and all such rules and
regulations shall become a part of this Article VIA.
In addition to any other remedies provided herein, any violation of §
184-25.4 above shall constitute a nuisance which may be abated by the Township or the Authorities, as applicable, by seeking mitigation of the nuisance, use of statutory enforcement procedures and/or such other appropriate equitable or legal relief from a court of competent jurisdiction as the Township determines is necessary to adequately abate the nuisance.