[Ord. 1200, 11/11/1974, § 1]
From and after the effective date of this Part, in those cases where the Township of Ross has erected, constructed, built or acquired a sanitary sewer or sewers either as trunk sewers or lateral sewers, and properties abutting upon said sanitary sewers are required to apply for a connection with such sanitary sewers, the person, firm or corporation making such application for connection shall be required to pay a tap-in or connection charge to the Township of Ross according to the classification into which the building or structure falls in the schedule set forth in §
18-122 hereof. Such tap-in or connection charge shall be paid in addition to any street opening permit fees or plumbing inspection fees and shall be paid whether or not the property which is the subject of such application has been assessed benefits for the erection, construction or acquisition of said sanitary sewer.
[Ord. 1200, 11/11/1974, § 2; as amended by Ord.
1726, 10/14/1991, § 18-502; and by Ord. 2288, 4/12/2010]
At the time that an application is made for the connection to
the said sanitary sewer there shall be paid to the Ross Township Manager
by each person, firm or corporation making the application a tap-in
or connection charge, as established from time to time by resolution
of the Board of Commissioners, based upon the extent or character
of the burden which the proposed connection places upon the public
sewer as set forth in the Fee Schedule of this Code.
[Ord. 1200, 11/11/1974, § 3; as amended by Ord.
1360, 6/30/1980; and by Ord. 1505, 7/8/1985, § 3; by Ord.
1726, 10/14/1991, § 18-503; and by Ord. 2288, 4/12/2010]
1. All private, lateral, sanitary sewer connections to a Township maintained
sanitary sewer system shall be made with the use of a saddle to be
installed by the Township of Ross. The owner of the premises connecting
to the Township maintained sanitary sewer system shall be responsible
for the excavating, shoring and uncovering of the sanitary sewer,
so that the Township employees shall be able to make the saddle connection
without any additional labor by way of excavating, shoring and uncovering.
At the time that an application is made for said connection, there
shall be paid to the Ross Township Manager by each person, firm or
corporation making such application a charge, in an amount as established
from time to time by resolution, to reimburse the Township for the
cost of its employees in making said connection.
2. At the time of the new connection is made to a Township maintained
sanitary sewer, it shall be the responsibility of the permit holder
to take accurate measurements from a point of connection to the main
sanitary sewer, indicating the depth of the connection below the finished
grade, and the location of the fresh air vent.