The size, slope, alignment, materials of construction of a building
sewer and the methods to be used in excavating, placing of the pipe,
joining, testing and backfilling the trench shall all conform to the
requirements of the plumbing code or other applicable rules and regulations
of the City, state or other relevant regulatory agency.