A.
Purpose. The purpose of this zoning article is to implement the goals, objectives and recommendations contained in the City of Margate 2017 Master Plan.
B.
Establishment of zones. For the purposes of this article, the City is hereby divided into 14 districts as follows:
[Amended 10-4-2012 by Ord. No. 16-2012; 1-31-2013 by Ord. No. 01-2013; 8-15-2013 by Ord. No. 17-2013; 10-4-2018 by Ord. No. 24-2018]
S-60 | Single-Family Residential |
S-60-WF | Single-Family Residential |
S-50 | Single-Family Residential |
S-40 | Single-Family Residential |
S-40-WF | Single-Family Residential |
S-30 | Single-Family Residential |
S-25 | Single-Family Residential |
S-25 (HD) | Historic Single-Family Residential |
TF | Two-Family Residential |
MF | Multi-Family Residential |
CBD | Central Business District |
C-1 | Commercial |
C-2 | Commercial/Business |
WSD | Waterfront Special District |
R | Riparian |
WAPC | Washington Avenue Pedestrian Corridor |
I | Institutional Use |
B | Beach |
C.
Zoning Map. The location and boundaries of the above districts are hereby established on the Zoning Map of the City of Margate in Atlantic County dated September 2018, which is filed in the office of the City Clerk. Said map or maps and all notations, references and designations shown thereon shall be part of this article as if the same were all fully described and set forth herein.[2]
[Amended 9-24-2006 by Ord. No. 2006-26; 10-4-2018 by Ord. No. 24-2018]
[2]
Editor's Note: The Zoning Map is also included as an attachment to this chapter.
D.
Interpretation of zone boundaries. Whenever an uncertainty or ambiguity exists as to the true location of any boundary line of any zone shown on the Map, the following rules shall apply:
(1)
The zone boundary lines are intended generally to follow street center lines, existing lot lines, center lines of railroad right-of-way, waterways, sewer and utility easements or as otherwise indicated on the Zoning Map.
(2)
Where a zone boundary line does not coincide with any such line as above set forth, its location or relation to another boundary line shall be as designated on said Zoning Map by means of figures or dimensions expressing distance in feet from a street side line or other boundary line.
(3)
In cases of uncertainty or disagreement as to the true location of any zone boundary line, the determination thereof shall be with the Planning Board.
[Amended 10-4-2018 by Ord. No. 24-2018]
(4)
All City-owned beachfront parcels or portion thereof contiguous and landward of existing bulkheads designated on the Zoning Map as B (Beach) shall, upon termination of government ownership, be considered designated the same zone as the contiguous nongovernmental owned parcel. The adjacent zones are S-30, S-40, CBD, and MF.
[Added 2-1-2018 by Ord. No. 03-2018; amended 10-4-2018 by Ord. No. 24-2018]
E.
Schedule of permitted uses. The schedule of permitted, conditional and accessory uses is contained in Schedule A and is hereby made part of this chapter.[3]
[3]
Editor's Note: Schedule A, containing the Schedule of Uses for Residential Districts and the Schedule of Uses for Nonresidential Districts, is included as an attachment to this chapter.
F.
Schedule of Area, Yard and Building Requirements. The Schedule of Area, Yard and Building Requirements is contained in Schedule B and is hereby made part of this chapter.[4]
[4]
Editor's Note: Schedule B, containing schedules of standards for residential and nonresidential districts, is included as an attachment to this chapter.
G.
Permitted uses. This zoning article shall be viewed as permissive. After the adoption of this chapter, no uses or structures shall be permitted in the City which are not listed as a permitted, accessory or conditional uses or unless permitted by the Zoning Board of Adjustment.
H.
Conditional uses. Notwithstanding compliance with specific conditional use standards hereinafter set forth, conditional uses shall require site plan approval by the appropriate board.
J.
All applicants for land use approvals and/or building permits are hereby advised that the City has used the best information available to it to provide owners/builders with guidance as to current FEMA requirements and standards but that development decisions are to be made by individual applicants based on their own due diligence. As such, applicants are advised that they proceed at their own risk.
[Added 1-31-2013 by Ord. No. 01-2013; amended 8-15-2013 by Ord. No. 17-2013]
.tif.SM.png)