[Amended 3-28-1995 by Ord. No. 744; 2-27-1997 by Ord. No. 758; 12-16-1997 by Ord. No. 789; 5-22-2001 by Ord. No. 840; 7-26-2005 by Ord. No. 900; 5-24-2011 by Ord. No. 990; 9-23-2014 by Ord. No. 1031; 4-26-2016 by Ord. No. 2016-05; 1-26-2021 by Ord. No. 2021-41]
The fees and charges required under the code of the Borough of Ho-Ho-Jus entitled "Construction Codes, Uniform" shall be as follows:
A.
The fee for a construction permit shall be the sum of the subcode fees listed in Subsection A(1) through (10) hereof, and shall be paid before the permit is issued.
(1)
New construction and additions are based on the volume of structure:
(a)
Volume of building in cubic feet x $0.07.
(b)
Fees for new construction of large, open-volume, single story spaces, such as barns, silos, greenhouses, warehouses, distribution centers, and other agricultural, and storage-use occupancies, the fee shall be based on volume and use groups as follows:
[Added 4-27-2021 by Ord. No. 2021-48]
[1]
For uses A1, A2, A3, A4, A5, F1, F2, S1, and S2: $0.021 per cubic foot.
[2]
For the purpose of calculating the volume to determine the fee for these spaces as defined under Subsection A(1)(b)[1] above, the height shall be limited to 20 feet notwithstanding the fact that the actual height of the space may be greater than 20 feet. However, the minimum fee shall be not less than $40.
(2)
Reconstruction, alterations, renovations, repairs are based on the cost of the work:
(a)
Based on cost of work: $25 per $1,000.
(3)
Demolition or removal permit:
(a)
For all principal buildings, the fee is $150.
(b)
For all residential accessory structures, the fee is $50.
(c)
For all nonresidential accessory structures, the fee is $80.
(d)
For all fuel tank removals, the fee is $100.
(e)
For removal of sheds over 100 square feet, the fee is $40.
(f)
For removal of sheds 100 square feet, or less, the fee is $40.
(5)
Signs: The fee is $1 per square foot. (Note: Fee to be based on one side of double-sided signs.)
(6)
Certificate of occupancy fees:
(a)
The fee for certificate of occupancy is $75.
(b)
The fee for certificate of occupancy based on change of use is $200 for nonresidential.
(c)
The fee for the first issuance and the renewal of a temporary certificate of occupancy shall be $30; provided, however, there shall be no fee for the first issuance of the temporary certificate of occupancy if the certificate of occupancy fee is paid at that time.
(8)
Asbestos removal permit is $50.
(9)
Minimum fee for building permit is $50.
(10)
Miscellaneous permit fees:
(a)
Commercial roof, the fee is $150.
(b)
Residential roof or siding, the fee is $75.
(c)
Detached (residential) building: roof or siding, the fee is $50.
(d)
Fireplaces and stoves, the fee is $50.
(e)
HVAC duct work, the fee is $50.
(f)
Fuel storage tank installation, the fee is $100.
(g)
Plan review credit: 20%.
(h)
Minimum fee for building subcode permit: $75.
(i)
Change in contractor: the fee is $25.