[Res. 95-16, 12/27/1995, § 1]
The Borough hereby adopts the Combined Sewer Overflow Policy attached hereto as Exhibit 1.[1]
[1]
Editor's Note: Exhibit 1 is included as an attachment to this chapter.
[Res. 95-16, 12/27/1995, § 2]
The Borough Solicitor and Borough Engineer are authorized to take all actions necessary to apply for and obtain a National Pollutant Discharge Elimination System permit for each CSO within the Borough.
[Res. 95-16, 12/27/1995, § 3]
The Borough Solicitor and Borough Engineer are authorized to communicate and meet with all necessary parties to develop a long-term characterization, monitoring and modeling plan and long-term combined sewer overflow control plan, said plans being subject to future approval by the Borough Council.